S.No Title & Ref.No Corrigendums Published Date Bid Open Date Details
1 Washing/Laundry service - 07-Mar-2019   07-Mar-2019 12:30:00 26-Mar-2019 15:00:00 View
2 Design and decoration of Kolkata Port Trust stall including production of exhibition materials in Domestic RBSM during India Rubber Expo 2019 at Mumbai   24-Dec-2018 13:00:00 31-Dec-2018 14:00:00 View
3 Design, production and printing of executive diaries of Kolkata Port Trust for the year 2019 - 27-Nov-2018   27-Nov-2018 17:29:00 03-Dec-2018 14:00:00 View
4 Design, production and printing of normal diaries of Kolkata Port Trust for the year 2019 - 27-Nov-2018   27-Nov-2018 17:29:00 03-Dec-2018 14:00:00 View
5 Design, production and printing of desk calendars...26-Nov-2018   26-Nov-2018 12:36:00 03-Dec-2018 14:00:00 View
6 Design, production and printing of special six page wall calendars...26-Nov-2018   26-Nov-2018 12:40:00 03-Dec-2018 14:00:00 View
7 Design, production and printing of single page wall calendars...26-Nov-2018   26-Nov-2018 12:42:00 03-Dec-2018 14:00:00 View
8 Providing Photocopying services to General Administration Department of Kolkata Port Trust - 16-July-2018   16-Jul-2018 14:20:00 10-Aug-2018 15:30:00 View
9 Engagement of facilitator / service provider for compliance with EPFO requirement of uploading and processing employee data - 13-July-2018   13-Jul-2018 16:05:00 03-Aug-2018 15:30:00 View
10 Printing, Binding and Supply of Administration Report - 13-June-2018
» Corrigendum-I
13-Jun-2018 15:56:00 06-Jul-2018 15:30:00 View
11 Expert Services towards implementation of Integrated Management System...25-May-2018   25-May-2018 15:22:00 12-Jun-2018 15:30:00 View
12 Engagement of Agency for Providing Messenger Service...13-April-2018
» Corrigendum-1
13-Apr-2018 17:18:00 16-May-2018 15:30:00 View
13 Upkeepment and errand services to General Administration Department - 27-Nov-2017   27-Nov-2017 11:50:00 02-Jan-2018 15:30:00 View
14 Design, production and printing of normal diaries of Kolkata Port Trust...25-Nov-2017   25-Nov-2017 14:10:00 29-Nov-2017 14:00:00 View
15 Design, production and printing of executive diaries of Kolkata Port Trust...25-Nov-2017   25-Nov-2017 14:20:00 29-Nov-2017 14:00:00 View
16 Design, production and printing of desk calendars of Kolkata Port Trust....14-Nov-2017
» Corrigendum
14-Nov-2017 11:30:00 21-Nov-2017 14:00:00 View
17 Design, production and printing of single page wall calendars of Kolkata Port Trust....14-Nov-2017   14-Nov-2017 12:00:00 21-Nov-2017 14:00:00 View
18 Design, production and printing of special six page wall calendars of Kolkata Port Trust...14-Nov-2017
» Corrigendum
14-Nov-2017 12:10:00 21-Nov-2017 14:00:00 View
19 Printing, Binding and Supply of Administrative Report for 2016-17   12-Jul-2017 17:40:00 07-Aug-2017 12:00:00 View
20 Design of the Cover of Administrative Report for the year 2016-17   12-Jul-2017 17:45:00 08-Aug-2017 12:00:00 View
21 Washing/laundry service for Washing and ironing of Selected curtains...15-Dec-2016   15-Dec-2016 11:20:00 13-Jan-2017 15:00:00 View
22 Greetings card with matching envelope...22-Nov-2016   22-Nov-2016 12:25:00 25-Nov-2016 15:00:00 View
23 Design, production and printing of single page wall calendars of Kolkata Port Trust for the year 2017   16-Nov-2016 12:35:00 21-Nov-2016 16:00:00 View
24 Design, production and printing of special six page wall calendars of Kolkata Port Trust for the year 2017   16-Nov-2016 14:10:00 21-Nov-2016 16:00:00 View
25 Washing/laundry service - 02-Nov-2016   02-Nov-2016 09:30:00 25-Nov-2016 15:00:00 View
26 De-pesting of Guesthouse of Kolkata Port Trust at 93,Chowringhee Road...22-Sept-2016   23-Sep-2016 09:30:00 20-Oct-2016 15:00:00 View
27 Photocopying work in the Head Office...05-AUG-2016   05-Aug-2016 11:50:00 23-Aug-2016 15:00:00 View
28 Printing, Binding & Supply of Administrative Report...12-July-2016   12-Jul-2016 15:30:00 01-Aug-2016 15:00:00 View
29 Design of the Cover of Administrative Report ...12-July-2016   12-Jul-2016 15:30:00 28-Jul-2016 15:00:00 View
30 Photocopying work...25-May-2016   25-May-2016 11:20:00 20-Jun-2016 15:00:00 View
31 Decoration of Kolkata Port Trust stall including production of exhibited materials in the Maritime India Summit 2016 at Bombay Convention & Exhibition Centre, Mumbai...02-March-2016
» Addendum
02-Mar-2016 14:40:00 15-Mar-2016 14:00:00 View
32 Appointment of Agency for providing application screening..-07-Jan-2016   07-Jan-2016 13:10:00 15-Jan-2016 14:30:00 View
33 Appointment of Agency for providing Application Screening and Data Processing Services.-18-Dec-2015
» Corrigendum
» Discharged
18-Dec-2015 13:10:00 Tender has been Terminated View
34 Design, production and printing of single page wall calendars...23-Nov-2015   23-Nov-2015 14:20:00 03-Dec-2015 12:00:00 View
35 Design, production and printing of special six page wall calendars...23-Nov-2015   23-Nov-2015 14:35:00 03-Dec-2015 12:00:00 View
36 Design of the Cover of Administrative Report...10-June-2015   10-Jun-2015 12:00:00 29-Jun-2015 16:30:00 View
37 Printing, Binding & Supply of Administrative Report...10-June-2015   10-Jun-2015 12:05:00 29-Jun-2015 16:30:00 View
38 Supply & operation of Lorry...14-May-2015   14-May-2015 15:30:00 12-Jun-2015 15:30:00 View
39 Supply & operation of Bus - 14-May-2015   14-May-2015 15:35:00 12-Jun-2015 16:00:00 View
40 Supply & Operation of Tata 207...   02-Apr-2015 16:25:00 30-Apr-2015 14:30:00 View
41 Hiring of Turn-out-Van...   02-Apr-2015 16:30:00 30-Apr-2015 15:30:00 View
42 Engagement of Agency for providing Messenger Service   25-Mar-2015 17:00:00 28-Apr-2015 15:00:00 View
43 Supply & Operation of Tata 207 or any other Similar Model - 26-Feb-2015   26-Feb-2015 12:00:00 20-Mar-2015 14:30:00 View
44 Hire of Turn-out-Van (24 hrs fixed duty, model-Tata-410) - 26-Feb-2015   26-Feb-2015 12:10:00 20-Mar-2015 15:30:00 View
45 Grant of permission for operating Floating Storage and Regasification Unit (FSRU) / Floating Storage Unit (FSU) for receiving, storing, regasifying (optional) and transporting LNG. - 27-Feb-2015
» Minutes of the Pre-Bid Meeting
17-Feb-2015 11:00:00 16-Mar-2015 15:00:00 View
46 Providing Messenger Service   16-Dec-2014 11:30:00 14-Jan-2015 15:00:00 View
47 Operating Floating Storage and Regasification Unit(FSRU) / Floating Storage Unit (FSU)
» Clange of clause
» Change of Clause and extension of opening date
» Change of Clause and extension of opening date - II
10-Dec-2014 15:00:00 16-Feb-2015 15:00:00 View
48 Hire of 24 hours Fixed Duty Ambulance   27-Nov-2014 11:00:00 26-Dec-2014 14:30:00 View
49 Tender for Supply & Operation of Tata 207 or any other Similar Model.
» Extension
02-Sep-2013 00:00:00 24-Feb-2014 00:00:00 View
 
Civil Engg. Department
S.No Title & Ref.No Corrigendums Published Date Bid Open Date Details
1 Cutting and trimming branches of trees etc. at inside N. S. Dock,Hydraulic Model Centre..-30-May-2019   30-May-2019 14:38:00 14-Jun-2019 15:00:00 View
2 Pumping out of stagnated water from any location (both inside & outside Dock area) under N.S.Docks..-30-May-2019   30-May-2019 14:55:00 14-Jun-2019 15:00:00 View
3 Thorough repair & renovation to both inside and outside of Toilet block..-29-May-2019
» CORRIGENDUM-I
29-May-2019 13:08:00 13-Jun-2019 15:00:00 View
4 Construction of boundary wall of erstwhile Baghbazar Ware House at Baghbazar..-24-May-2019   24-May-2019 15:59:00 04-Jun-2019 15:00:00 View
5 Repairing of broken boundary wall, roof treatment including construction..-23-May-2019
» CORRIGENDA
23-May-2019 16:11:00 13-Jun-2019 15:00:00 View
6 Maintenance day to day operation, providing services of night time watch..-22-May-2019   22-May-2019 12:00:00 13-Jun-2019 15:00:00 View
7 Civil works including Plumbing and sanitary works and other ancilliary works..-22-May-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
22-May-2019 14:54:00 29-May-2019 15:00:00 View
8 Petty miscellaneous repairs to sheds,buildings, goomties etc at Dock-I..-22-May-2019   22-May-2019 16:20:00 13-Jun-2019 15:00:00 View
9 Renewing of Sewer lines & construction of Septic tanks..-20-May-2019   20-May-2019 12:25:00 11-Jun-2019 15:00:00 View
10 Construction of chain link fencing around Kantapukur CISF Barrack..-17-May-2019   17-May-2019 13:20:00 11-Jun-2019 15:00:00 View
11 Construction of Toilet block for the convenience of the Mosque users ..-15-May-2019   15-May-2019 14:48:00 23-May-2019 15:00:00 View
12 Daily operation of Sluice Valve for supply of water from main overhead tank..-13-May-2019
» CORRIGENDUM
13-May-2019 11:40:00 30-May-2019 15:00:00 View
13 Maintenance of Garden at Dock Training Institute at 51 CGR road ..-10-May-2019
» CORRIGENDUM-I
10-May-2019 17:30:00 06-Jun-2019 15:00:00 View
14 Anti-termite treatment and Rodent Control works at KOPT Head Office building at 15, Strand Road ...-09-May-2019   09-May-2019 11:12:00 31-May-2019 15:00:00 View
15 Upkeepment and maintenance of the Engineering Accounts Wing at 1st Floor 6, Fairlie place, kolkata...-06-May-2019   06-May-2019 10:41:00 27-May-2019 15:00:00 View
16 Providing assistance for upkeepment of office premises of Superintending Engineer (N.S.D) at 51,C.G.R road, site office of Superintending Engineer (N.S.D) at no 8 work shop and site office near gate no.3 N.S.Dock...03-May-2019   03-May-2019 12:45:00 29-May-2019 15:00:00 View
17 Petty plumbing and sanitary works at Dock-1(East), Dry Dock area and C.M.M. Compound to Mooring Masters' Office, Tuktaghat, Fair Field area, Island workshop and Sr.Shipwright office...03-May-2019   03-May-2019 14:30:00 25-May-2019 15:00:00 View
18 Jungle cutting including Uprooting and Removing of Vegetation, Grass, Bushes...03-May-2019   03-May-2019 16:10:00 28-May-2019 15:00:00 View
19 Erection of barbed wire fencing along the river bank including repairing of boundary wall, security goomties and other miscellaneous works...30-April-2019   30-Apr-2019 12:10:00 22-May-2019 15:00:00 View
20 Pumping out of stagnated water from any location (both inside and outside Dock area) under K.P.Docks...30-April-2019   30-Apr-2019 14:05:00 22-May-2019 15:00:00 View
21 Jungle cutting including uprooting and removing vegetation,grass,bushes,etc.at Dock-I (East),Dock-II(East),Dry Dock,CMM Compound including Tuckta Ghat and Fairfield, Kantapukur CISF Barrack and Sister Nivedita Abasan,K.P.Docks...30-April-2019   30-Apr-2019 14:10:00 22-May-2019 15:00:00 View
22 Misc. petty repairs to sheds, different Goomty /Office Bldgs. Electrical Substations/ Transformer Rooms/Pump House/Workshops/Other Small Structures/ Boundary Wall/ Drain etc. at inside of entire N.S. Docks Area...29-April-2019   29-Apr-2019 17:05:00 21-May-2019 15:00:00 View
23 Repairing & improvement of existing drainage system from Subhas Bhaban to KMC main drain at the South side of C.G.R Road (N.S Dock) - 26-April-2019
» Corrigendum-I
26-Apr-2019 12:40:00 22-May-2019 15:00:00 View
24 Providing services for general upkeepment (Attendant and House Keepers ),maintenance and housekeeping etc. at the office of...-25-April-2019   25-Apr-2019 13:43:00 03-May-2019 15:00:00 View
25 Providing barbed wire fencing along the river front 3, 4 GRJ area including patrolling track..-25-April-2019   25-Apr-2019 15:31:00 21-May-2019 15:00:00 View
26 Thorough Renovation and Painting Work of DRM Office building,South Cabin Building, Driver & Technical Office Building..-24-April-2019   24-Apr-2019 12:50:00 14-May-2019 15:00:00 View
27 Thorough repair & renovation to both inside and outside of Toilet block near Canteen Building..-24-April-2019   24-Apr-2019 16:08:00 09-May-2019 15:00:00 View
28 Tender for repairs, replacement , maintenance of Bascule Bridge( Nazrul Setu) deck joint plates, structural members of bridge....-23-April-2019   23-Apr-2019 14:40:00 16-May-2019 15:00:00 View
29 E-TENDER for “Development of two wheeler parking area beside 4 & 3 NSD....-22-April-2019   22-Apr-2019 13:40:00 17-May-2019 15:00:00 View
30 Repairing and replacement of worn out damaged wooden decking planks...-22-April-2019   22-Apr-2019 13:50:00 17-May-2019 15:00:00 View
31 Repairs and Rehabilitation of Fairlie Warehouse (CRDC) KoPT at 6, Fairlie Place, Kolkata - 18-April-2019   18-Apr-2019 11:15:00 10-May-2019 15:00:00 View
32 Construction of 4NSD main gate at Netaji Subhas Dock including development of outside area of 4 NSD gate & rail gate,electrical works & other allied works...18-April-2019   18-Apr-2019 13:45:00 24-May-2019 15:00:00 View
33 Displaying various board/signal/direction and symbols at inside N.S Dock and other allied works at N.S Dock - 18-April-2019
» Corrigendum-I
18-Apr-2019 16:50:00 08-May-2019 15:00:00 View
34 Cleaning and disinfecting different types & size of drinking water tanks inside & outside dock under NSD section for one year from the date of work order - 17-April-2019   17-Apr-2019 12:30:00 30-Apr-2019 15:00:00 View
35 Thorough rehabilitation of bituminous carriageways of P N Banerjee Road & thorough repairing of Graham Road and other allied roads at Petroleum Wharves Budgebudge...17-April-2019   17-Apr-2019 14:42:00 08-May-2019 15:00:00 View
36 Periodical jungle cutting and removing of jungles at different areas of N.S. Dock for a period of one year...16-April-2019   16-Apr-2019 15:50:00 30-Apr-2019 15:00:00 View
37 Repairing/ modification of boundary wall of Hydraulic Model Centre and other allied works - 16-April-2019
» Corrigendum-I
16-Apr-2019 16:55:00 17-May-2019 15:00:00 View
38 Restoration of dislocated gravity fenders along with thorough repair of KoPT RCC Jetty at Raichak - 16-April-2019   16-Apr-2019 17:05:00 09-May-2019 15:00:00 View
39 Construction of Paver Block road from 10 no. NSD to Gate to 11 no. NSD Gate including improvement of drainage system, N.S. Dock - 12-April-2019   12-Apr-2019 11:30:00 03-May-2019 15:00:00 View
40 Cleaning of existing drain including repairs the minor damaged portion along the sick line road, Dhobitola road, C.G.R. road , G R Road...12-April-2019   12-Apr-2019 11:40:00 03-May-2019 15:00:00 View
41 Levelling and dressing of the area of NTWC with moorum topping, providing concertina over boundary wall, construction of a septic tank and other allied works...11-April-2019   11-Apr-2019 14:45:00 18-Apr-2019 15:00:00 View
42 Periodical jungle cutting and removing of jungles at different areas of N.S. Dock...28-Mar-2019
» Tender Cancellation Corrigendum Notice
28-Mar-2019 12:02:00 Tender has been Terminated View
43 Preparation of Waste Management Plan for Kolkata Dock System and Haldia Dock Complex of Kolkata Port Trust - 27-Mar-2019   27-Mar-2019 13:20:00 22-Apr-2019 15:30:00 View
44 Fulfilling requirement of seeds (flowers and vegetables ) manures and fertilizers, insecticides and pesticides, and maintenance of gardenining works...25-Mar-2019   25-Mar-2019 11:50:00 03-Apr-2019 15:00:00 View
45 Supplying of daily labourers for miscellaneous non-measurable works and pumping services...25-Mar-2019   25-Mar-2019 12:20:00 17-Apr-2019 15:00:00 View
46 Cleaning & Disinfection of Underground Vats. Overhead Fresh Water Tanks at Head Office Building...18-Mar-2019   18-Mar-2019 15:40:00 09-Apr-2019 15:00:00 View
47 Providing water proofing treatment for roofs of building nos. 4 & 12, 9, 17B, 15A, 11A & 19A at Port Land Park Campus including...07-Mar-2019   07-Mar-2019 10:30:00 27-Mar-2019 15:00:00 View
48 Design, Engineering, Supply and Installation of water sprinkling system including supervision, operation and maintenance period of one year for dust suppression of coal stock piles at Coal berth area of K.P.Docks...06-Mar-2019
» Corrigendum-I
06-Mar-2019 14:10:00 11-Apr-2019 15:00:00 View
49 Fencing Surrounding the Effluent Treatment Plant at Centenary Hospital...06-Mar-2019   06-Mar-2019 16:10:00 26-Mar-2019 15:00:00 View
50 Design, fabricate, supply , test and deliver of one no. Main Pontoon of size 30.0M x 9.25M x 1.60M (average depth) fitted with all fittings, fixtures and fenders all complete at approved location at Kolkata Dock System or at Bdge Budge Moorings and one no. for Diamond Harbour Jetty - 27-Feb-2019
» Corrigendum-I
» Corrigendum-II
» Corrigendum-III
» Corrigendum-IV
» Corrigendum-V
27-Feb-2019 16:20:00 29-Apr-2019 15:00:00 View
51 Providing water proofing treatment for roofs of building...25-Feb-2019
» Corrigendum-I
25-Feb-2019 10:25:00 13-Mar-2019 15:00:00 View
52 Petty Miscellaneous repairing works and other ancillary works including Jungle cutting at Sector - 1 to 5 and New Taratala colony as and when required at Taratala qtrs complex...21-Feb-2019   21-Feb-2019 11:50:00 15-Mar-2019 15:00:00 View
53 Petty Plumbing & Sanitary works of Subhas Bhaban, P65, PSO Complex, Loco Shed, CGR area, Hydraulic Model Centre under N.S. Dock for one year from the date of work order - 20-Feb-2019   20-Feb-2019 11:25:00 14-Mar-2019 15:00:00 View
54 Through renovation (outside & inside) of Hi-fix building and main building of H.S.D. including renovation of adjoining structure and boundary wall and including plumbing works at N.S.Dock - 20-Feb-2019   20-Feb-2019 13:10:00 13-Mar-2019 15:00:00 View
55 Providing services for upkeepment of office premises of Superintending Engineer (Civil)...18-Feb-2019   18-Feb-2019 12:15:00 12-Mar-2019 15:00:00 View
56 Repair & painting for RCC Overhead water reservoirs at CMM Compound, K.P Docks under action plan for Swachh Bharat...18-Feb-2019   18-Feb-2019 17:28:00 08-Mar-2019 15:00:00 View
57 Mowing Lawns, Jungle Cutting and Trimming Branches of Trees...13-Feb-2019   15-Feb-2019 12:00:00 01-Mar-2019 15:00:00 View
58 Petty miscellaneous Civil works to Head Office main building, Annexe Building, New Per-audit building, Dispensary, Co-operative Credit Society. Tiffin Club...15-Feb-2019   15-Feb-2019 15:00:00 12-Mar-2019 15:00:00 View
59 Petty Miscellaneous repairing works at Centenary Hospital, Hospital Park Quarters, CISF Guest House, DRM office...14-Feb-2019
» Corrigendum-I
14-Feb-2019 12:10:00 07-Mar-2019 15:00:00 View
60 Construction of proposed Toilet Blocks at Ground Floor and 1st Floor of NPPS - 14-Feb-2019
» Corrigendum
14-Feb-2019 17:15:00 11-Mar-2019 15:00:00 View
61 Regradation of depressed level (low cost) at back side of shed no - 4,6,8 & 10 at Dock-I (W) KPD using old bricks available from N.S.Docks and other ancillary works - 13-Feb-2019   13-Feb-2019 11:12:00 07-Mar-2019 15:00:00 View
62 Petty works at Rabindra Setu deck, approach footpath including flyover & Rabindra Setu Office, Rabindra Setu Traffic Guard Office, etc. as and when necessary for a period of ONE year from the date of placement of work order - 13-Feb-2019   13-Feb-2019 12:40:00 05-Mar-2019 15:00:00 View
63 Modification of existing PF Office in connection with proposed Accounts Office at 1st Floor of Fairlie Warehouse Bay No.08 - 13-Feb-2019   13-Feb-2019 13:00:00 07-Mar-2019 15:00:00 View
64 Providing services for upkeepment of office premises of Superintending Engineer (Env) at gate No 3 , KP Docks for 02(two) years...12-Feb-2019   12-Feb-2019 14:50:00 05-Mar-2019 15:00:00 View
65 Construction of 4NSD main gate at Netaji Subhas Dock including development of outside area of 4 NSD gate & rail gate,electrical works & other allied works...08-Feb-2019   08-Feb-2019 11:00:00 28-Feb-2019 15:00:00 View
66 New Construction of Three (3) number of CISF Room And repairing CISF watch tower at EJC yard - 01-Feb-2019   01-Feb-2019 12:52:00 26-Feb-2019 15:00:00 View
67 Roof Treatment by APP Membrane at Flat Roofs of Shed No. 22, 23 & 24 at KPD Dock - II - 01-Feb-2019
» Corrigendum-I
01-Feb-2019 13:50:00 08-Feb-2019 15:00:00 View
68 Construction of a new two storied Building for Crew's shelter near Lock Entrance including other allied works, N.S. Docks...01-Feb-2019
» Corrigendum-I
01-Feb-2019 15:40:00 08-Mar-2019 15:00:00 View
69 Spreading, Levelling & Rolling of rubbish stacked in between main road...30-Jan-2019
» Corrigendum-I
30-Jan-2019 15:00:00 20-Feb-2019 15:00:00 View
70 Repair /maintenance work of paver block yards/roads/berth...29-Jan-2019   29-Jan-2019 13:15:00 26-Feb-2019 15:00:00 View
71 Petty Plumbing and sanitary works to KOPT Guest at 93, Chowringhee Road...28-Jan-2019
» Corrigendum
28-Jan-2019 10:56:00 19-Feb-2019 15:00:00 View
72 Providing services for general upkeepment (Attendant and House Keepers ), maintenance and housekeeping...24-Jan-2019   24-Jan-2019 13:20:00 01-Feb-2019 15:00:00 View
73 Preparation of Waste Management Plan for Kolkata Dock System and Haldia Dock Complex...24-Jan-2019
» Corrigendum-I
24-Jan-2019 16:00:00 20-Feb-2019 15:30:00 View
74 Miscellaneous repairs/maintenance of damaged portion of Brace Bridge...22-Jan-2019   22-Jan-2019 15:08:00 19-Feb-2019 15:00:00 View
75 Petty plumbing and sanitary works within KoPT Head Office premises at 15, Strand Road...22-Jan-2019   22-Jan-2019 17:15:00 15-Feb-2019 15:00:00 View
76 False ceiling and renovation of M.S Room, replacement of existing defective Rimless Glass...11-Jan-2019   11-Jan-2019 13:05:00 07-Feb-2019 15:00:00 View
77 Repairing and replacement of worn out damaged wooden decking planks and steel works including painting of all the structural members of Man Of War Jetty - 09-Jan-2019   09-Jan-2019 15:55:00 07-Feb-2019 15:00:00 View
78 Water proofing treatment on roofs including sealing of expansion joints at different floor levels of Centenary Hospital and other buildings...04-Jan-2019
» Corrigendum - I
04-Jan-2019 15:20:00 29-Jan-2019 15:00:00 View
79 Construction of proposed Toilet Blocks at Ground Floor and 1st Floor of NPPS - 04-Jan-2019
» Corrigendum
04-Jan-2019 16:02:00 29-Jan-2019 15:00:00 View
80 Roof treatment with APP membrane at URS Station, Budgebudge - 04-Jan-2019   04-Jan-2019 16:34:00 28-Jan-2019 15:00:00 View
81 Works related to Swatch Bharat Abhijan at KoPT Centenary Hospital premises - 02-Jan-2018   02-Jan-2019 16:20:00 29-Jan-2019 15:00:00 View
82 Maintenance of Slab Seal Type Deck Joints of Brabourne Road Flyover including replacement of damaged units...26-Dec-2018   26-Dec-2018 17:18:00 17-Jan-2019 15:00:00 View
83 Construction of a new two storied Building for Crew's shelter near Lock Entrance including other allied works, N.S. Docks - 26-Dec-2018
» Corrigendum
26-Dec-2018 17:25:00 15-Jan-2019 15:00:00 View
84 Part - A Petty plumbing works as may be necessary at Taratala Colony under use for a period of one year and Part-B Annual removal of chokage of sanitary fittings at Taratala KoPT colony under use for a period of one year - 18-Dec-2018   18-Dec-2018 12:25:00 07-Jan-2019 15:30:00 View
85 Waterproofing treatment work by APP modified prefabricated water proofing membrane to the roof of Dock master office..17-Dec-2018   17-Dec-2018 11:45:00 08-Jan-2019 15:00:00 View
86 Repair and renovation to the outside and inside of shed no. 24 including surrounding drains and depressed surface area at K.P. Dock-II - 14-Dec-2018   14-Dec-2018 12:10:00 03-Jan-2019 15:00:00 View
87 Part A False ceiling and renovation of M.S Room, replacement of existing defective Rimless Glass Door...14-Dec-2018   14-Dec-2018 16:00:00 08-Jan-2019 15:00:00 View
88 Repairs and Rehabilitation of Fairlie Warehouse (CRDC) KoPT at 6, Fairlie Place, Kolkata...10-Dec-2018   10-Dec-2018 13:45:00 03-Jan-2019 15:00:00 View
89 Repair & painting for RCC Overhead water reservisor at CMM Compound, K.P Docks under action plan for Swachh Bharat - 10-Dec-2018   10-Dec-2018 10:10:00 27-Dec-2018 15:00:00 View
90 Development of green verge including plantation of trees along boundary wall of ETC agro just opposite to shed 29, 28 at Dock-II - 07-Dec-2018   07-Dec-2018 12:55:00 27-Dec-2018 15:00:00 View
91 Provision of false ceiling and other miscellaneous works at required area of barrack shed inside CISF parade ground at Kantapukur...06-Dec-2018
» Corrigendum - 1
06-Dec-2018 11:01:00 27-Dec-2018 15:00:00 View
92 Water proofing treatment to the roof of KOPT Head Office old building, canteen and adjoining small roof...04-Dec-2018   04-Dec-2018 12:15:00 31-Dec-2018 15:00:00 View
93 Sinking of Tube Well (50 mm x 100 mm dia) at DRM office (EJC Yard) and some other ancillary works - 04-Dec-2018   04-Dec-2018 13:45:00 24-Dec-2018 15:00:00 View
94 Proposed boundary wall at play ground, including dismantling of existing wall at Taratala Colony - 30-Nov-2018   30-Nov-2018 14:36:00 28-Dec-2018 15:00:00 View
95 Periodical Slot marking and Crane track marking work for proper Yard Management for one year from the date of placement of Work Order, N. S. Dock - 30-Nov-2018   30-Nov-2018 16:00:00 28-Dec-2018 15:00:00 View
96 Thorough inside repairs and renovation works including sanitary & plumbing works for official residence...29-Nov-2018
» Corrigendum
29-Nov-2018 15:30:00 10-Dec-2018 15:30:00 View
97 Petty Miscellaneous Works along with Petty Plumbing and Sanitary Works to NHBQ Class-III & IV Staff Quarters...27-Nov-2018
» Corrigenda-II
27-Nov-2018 14:50:00 27-Dec-2018 15:00:00 View
98 Repairing and replacement of worn out damaged wooden decking planks and steel works including painting...22-Nov-2018   22-Nov-2018 11:58:00 18-Dec-2018 15:00:00 View
99 Periodical maintenance work of different road including inside Dock...20-Nov-2018
» Corrigendum-I
20-Nov-2018 13:07:00 18-Dec-2018 15:00:00 View
100 Providing services for general upkeepment (Attendant and House Keepers ), maintenance and housekeeping etc. at the office of the Ground Floor of the Chairman's Bungalow...20-Nov-2018   20-Nov-2018 16:34:00 19-Dec-2018 15:00:00 View
101 Thorough renovation of Chairman and Dy. Chairman’s Enclosures at 3rd Floor of Subhas Bhaban...16-Nov-18   16-Nov-2018 10:40:00 06-Dec-2018 15:00:00 View
102 Maintenance of existing landscape and garden of KoPT Centenary Hospital at Majerhat..13-Nov-18   13-Nov-2018 15:10:00 12-Dec-2018 15:00:00 View
103 Providing upkeepment and maintenance of the office under Superintending Engineer(Rly)...13-Nov-18   13-Nov-2018 15:15:00 12-Dec-2018 15:00:00 View
104 Development of container stacking yard at 3 NSD Shed area and adjacent green verge area...08-Nov-2018   08-Nov-2018 10:55:00 29-Nov-2018 15:00:00 View
105 Providing services of unskilled labour to assist the Chief Engineer's Office at KOPT Head Office...07-Nov-2018   07-Nov-2018 13:04:00 29-Nov-2018 15:00:00 View
106 Construction of raised pathway between 3 NSD gate and Masjid...02-Nov-2018   02-Nov-2018 15:00:00 28-Nov-2018 15:00:00 View
107 Renovation of East Yard Mess near gate no 5, KPD...02-Nov-2018   02-Nov-2018 14:50:00 27-Nov-2018 15:00:00 View
108 Petty plumbing works as may be necessary at Taratala Colony...01-Nov-2018
» Corrigendum
01-Nov-2018 15:50:00 01-Dec-2018 15:30:00 View
109 Miscellaneous conservancy upkeepment works at Portland Park Quarters' premises...23-Oct-2018
» Corrigendum-I
23-Oct-2018 16:45:00 02-Nov-2018 15:00:00 View
110 Development of area between 1 CPY & Reefer Park area & adjoining green verge area for Container Parking Yard including...11-Oct-2018
» Corrigendum-I
11-Oct-2018 14:00:00 30-Oct-2018 15:00:00 View
111 Temporary patch repairing and cleaning to the ground floor...10-Oct-2018   10-Oct-2018 16:35:00 30-Oct-2018 15:00:00 View
112 Cleaning and disinfecting different types & size of drinking water tanks inside & outside dock under NSD section...05-Oct-2018   05-Oct-2018 16:39:00 26-Oct-2018 15:00:00 View
113 Petty Miscellaneous works to KoPT Offices at Kolkata Jetty (including Workshop), Fairlie Warehouse, Hillary Institute, Toll collection Office...04-Oct-2018
» Corrigendum
04-Oct-2018 11:00:00 29-Oct-2018 15:00:00 View
114 Supplying drinking water at different places by Water Tanker under N.S.Dock Section including Dock Labour Board...03-Oct-2018
» Corrigendum-I
» Corrigendum-II
03-Oct-2018 12:35:00 30-Oct-2018 15:00:00 View
115 Demolition of old building (Canteen) behind block No. 9 & old ComputerBooth...03-Oct-2018   03-Oct-2018 17:08:00 15-Oct-2018 15:00:00 View
116 Through renovation and face lifting of both outside & inside of office building...01-Oct-2018
» Corrigendum-I
» Corrigendum-II
01-Oct-2018 15:59:00 31-Oct-2018 15:00:00 View
117 Allied Civil works for installation of Mobile XRay Container Scanning System consisting of...27-Sept-2018
» Corrigendum-I
27-Sep-2018 13:12:00 26-Oct-2018 15:00:00 View
118 Thorough repairing of bituminous carriageways of P N Banerjee Road...25-Sept-2018
» Corrigendum-I
25-Sep-2018 12:45:00 26-Oct-2018 15:00:00 View
119 Reconstruction of JJP road leading to the premises of M/s. Century Ply...24-Sept-2018
» Corrigendum-I
24-Sep-2018 12:11:00 12-Oct-2018 15:00:00 View
120 Repairs and Rehabilitation of Fairlie Warehouse (CRDC) KoPT at 6, Fairlie Place...24-Sept-2018
» Corrigendum-I
24-Sep-2018 12:35:00 12-Oct-2018 15:00:00 View
121 Urgent repairing of damaged Jetty No:-1 at Petroleum Wharves Budgebudge...20-Sept-2018
» Corrigendum
20-Sep-2018 10:45:00 27-Sep-2018 15:30:00 View
122 Providing supporting staff for operating of Coal Dock Road parking yard...20-Sept-2018
» Corrigendum-I
» Corrigendum-II
20-Sep-2018 13:40:00 26-Oct-2018 15:00:00 View
123 Thorough repairing and up-gradation of Jetty approch road from KOPT main gate...19-Sept-2018
» Corrigendum-I
» Corrigendum-II
19-Sep-2018 15:44:00 23-Oct-2018 15:00:00 View
124 Renoavtion of East Yard Mess near gate no 5, KPD presently occupied by PSO personnel - 19-Sept-2018
» Corrigendum-I
» Corrigendum-II
19-Sep-2018 15:45:00 23-Oct-2018 15:00:00 View
125 Preparation of Waste Management Plan for Kolkata Dock System and Haldia Dock Complex...14-Sept-2018
» Corrigendum-I
» Corrigendum - II
14-Sep-2018 16:48:00 26-Oct-2018 15:30:00 View
126 Safe demolition of one 20-25 metre high (approx.) 50,000 Gallon (approx) capacity dilapidated overhead RCC Water Tank...13-Sept-2018   13-Sep-2018 15:24:00 27-Sep-2018 15:30:00 View
127 Miscellaneous conservancy upkeepment works at Dumyane Avenue qrts. Premises, Nimak Mahal Qrts. Premises...12-Sept-2018
» Corrigendum-I
» Corrigendum-II
12-Sep-2018 10:42:00 27-Sep-2018 15:00:00 View
128 Fencing of 3 Vacant Plots (2, 4 & 21) at Dhobitala Container Park, which are presently under the possession of KoPT - 12-Sept-2018
» Corrigendum - I
» Corrigendum-II
» Corrigendum-III
12-Sep-2018 13:12:00 11-Oct-2018 15:00:00 View
129 Rodent Control Treatment of all sheds at Dock-I (East &West) and Dock-II except shed No.11...11-Sept-2018
» Corrigendum-I
» Corrigendum-II
» Corrigendum-III
11-Sep-2018 15:10:00 11-Oct-2018 15:00:00 View
130 Repair/Renovation of Outram Ghat Jetty No. 2 for creation of common user tourism facility..10-Sept-2018   10-Sep-2018 13:30:00 03-Oct-2018 15:00:00 View
131 Emergency repair of damaged stretch of Hide Road starting from approach of Brace Bridge...07-Sept-2018   07-Sep-2018 13:10:00 11-Sep-2018 15:30:00 View
132 Cleaning of jungles,dressing of yard etc. at the operational areas of EJC yard from Majherhat to Sondingi...29-Aug-2018
» Corrigendum
29-Aug-2018 16:51:00 17-Sep-2018 15:30:00 View
133 Installation of 2 nos Steel Gates at Saheb Bazar Godown, Fixing of 1 no. Collapsable Gate at Maidan Tent...13-Aug-2018   13-Aug-2018 10:08:00 22-Aug-2018 15:00:00 View
134 Thorough inside repairs and renovation works including providing false ceiling works...13-Aug-2018   13-Aug-2018 12:40:00 30-Aug-2018 15:30:00 View
135 Providing Fire Safety measures at the Kitchen, Gas Bank and other allied areas...10-Aug-2018   10-Aug-2018 11:39:00 30-Aug-2018 15:30:00 View
136 Sinking of 50 mm x 100 mm Dia. Tube Well with installation of 1 HP Submersible Pump with motor set and allied works...10-Aug-2018   10-Aug-2018 11:42:00 31-Aug-2018 15:00:00 View
137 Through inside and outside repairs and renovation works including sanitary & plumbing works...08-Aug-2018   08-Aug-2018 14:30:00 20-Aug-2018 15:30:00 View
138 Development scheme for revamping of drainage system & leveling of depressed area of berths & alley roads from Shed No. 22 to Shed No. 26 with a paved single lane road...08-Aug-2018
» Corrigendum-I
08-Aug-2018 11:55:00 31-Aug-2018 15:30:00 View
139 Thorough renovation including interior decoration, plumbing & sanitary works, landscaping works, electrification, air-conditioning & fire alarm & detection system at Kolkata Port Trust Guest House...07-Aug-2018
» Corrigendum-I
» Corrigendum - II
» Corrigendum-III
» Corrigendum-IV
» Corrigendum-V
07-Aug-2018 12:20:00 04-Sep-2018 15:30:00 View
140 Repairing / restoration of boundary wall and main gate of new colony including construction of dustbin - 03-Aug-2018   03-Aug-2018 15:50:00 28-Aug-2018 15:30:00 View
141 Removal of refuse, garbage etc from the different offices, residential colonies of KoPT...31-July-2018   31-Jul-2018 11:20:00 23-Aug-2018 15:30:00 View
142 Thorough inside repairs and renovation works including sanitary & plumbing works...27-July-2018   27-Jul-2018 10:30:00 16-Aug-2018 15:30:00 View
143 Selection of a Consultant for Preparation of Detailed Project Report...27-July-2018
» Corrigendum-I
» Corrigendum-II
» Corrigendum-III
» Corrigendum-IV
» Corrigendum-V
» Corrigendum-VI
» Tender notice dated 31.10.2018
27-Jul-2018 16:50:00 01-Nov-2018 15:00:00 View
144 Design, fabricate, supply , test and deliver at approved location at Kolkata Dock System or at Budge Budge Moorings one no. Main Pontoon of size 30.0M x 9.25M x 1.60M (average depth) fitted with all fittings, fixtures and fenders...25-July-2018   25-Jul-2018 16:00:00 17-Aug-2018 15:30:00 View
145 Construction of Septic Tank and other plumbing and sanitary works at South Cabin (EJC Yard) - 16-July-2018   16-Jul-2018 16:30:00 02-Aug-2018 15:00:00 View
146 Replacement of 20 Ton C.I. Stag Horn Bollards & MS Bull Rings at Different Locations of K.P.Dock - 11-July-2018   11-Jul-2018 12:45:00 07-Aug-2018 15:30:00 View
147 Water proofing treatment to the roof of offices of Sr. Shipwright, Dry Dock Supdt., Supdt. Dock - I (East), Environment, Impounding Pump House...11-July-2018   11-Jul-2018 12:56:00 07-Aug-2018 15:30:00 View
148 Supply of earthmovers/ mechanical excavator on hire , cutting jungles , supply of unskilled labourers and other related works for dressing / levelling...10-July-2018
» Corrigendum
10-Jul-2018 15:24:00 01-Aug-2018 15:30:00 View
149 Through inside and outside repairs and renovation works including sanitary & plumbing works, changing of structural framework and trusses...09-July-2018
» Corrigendum-I
09-Jul-2018 13:20:00 03-Aug-2018 15:30:00 View
150 Temporary approach walkway from Aaila Embankment to Tidal Observatory of shore based Pilot Station...9-July-2018   09-Jul-2018 14:25:00 23-Jul-2018 15:30:00 View
151 Supply of earthmovers/ mechanical excavator on hire , cutting jungles , supply of unskilled labourers and other related works...06-July-2018
» Corrigendum
06-Jul-2018 10:00:00 18-Jul-2018 15:30:00 View
152 Supply of earthmovers/ mechanical excavator on hire , cutting jungles , supply of unskilled labourers and other related works for dressing / levelling etc...06-July-2018
» Corrigendum
06-Jul-2018 10:15:00 18-Jul-2018 15:30:00 View
153 Petty Miscellaneous repairing works within Petroleum Wharf area at Budge Budge, Roychak Stn. Building, Akra, Moyapur Semaphore at Moyapur...06-07-2018   06-Jul-2018 17:00:00 30-Jul-2018 15:00:00 View
154 Cleaning of drains at N.S. Dock including Alifnagar Crews' Qtrs...05-July-2018   05-Jul-2018 15:38:00 30-Jul-2018 15:30:00 View
155 Weedicide treatment along with Jungle Cutting in and around Petroleum Wharf area of Budge Budge (PWBB) including the area beyond No. 8 Jetty up to...04-July-2018   04-Jul-2018 16:45:00 24-Jul-2018 15:30:00 View
156 Levellng and strengthening of South side of main road starting from 2 NSD GRJ gate to clock tower with improvement of drainage system for parking yard - 03-July-2018   03-Jul-2018 11:51:00 27-Jul-2018 15:30:00 View
157 Providing fencing including repairing of existing boundary wall...03-July-2018   03-Jul-2018 17:17:00 16-Jul-2018 15:30:00 View
158 Construction of sewerage system by laying of new S.W. Pipeline, Inspection Pit to maintain proper hygienic environment at Chetla KoPT Quarters - 03-July-2018   03-Jul-2018 17:20:00 16-Jul-2018 15:30:00 View
159 Construction of a clay tennis court including fencing at Kantapukur CISF Barrack - 02-July-2018   02-Jul-2018 15:47:00 26-Jul-2018 15:30:00 View
160 Petty repairs of different roads of South Division to maintain the roads in a motorable condition...29-June-2018
» Corrigendum
» Corrigendum-II
29-Jun-2018 10:25:00 17-Jul-2018 15:30:00 View
161 Thorough repairing of one number steel pontoon at Petroleum Wharves Budgebudge - 29-June-2018
» Corrigendum-I
29-Jun-2018 11:15:00 26-Jul-2018 15:30:00 View
162 Design , fabricate, supply, test, and deliver at approved location at Kolkata Dock System or at Budge Budge Moorings one no. Main Pontoon of size 30.00m X 9.25m X 1.60m.(average depth) fitted with all fittings, fixtures and rubber fender...27-June-2018
» Corrigendum-I
27-Jun-2018 12:40:00 20-Jul-2018 15:30:00 View
163 Supply of Daily labours at various sites under Kolkata Section for carrying out miscellaneous work...27-June-2018   27-Jun-2018 14:54:00 19-Jul-2018 15:30:00 View
164 Construction of Toilet block and rest shed at M & Q Truck Parking Yard...26-June-2018
» Corrigendum-I
» Corrigendum-II
26-Jun-2018 12:09:00 17-Jul-2018 15:30:00 View
165 Removal of refuse, garbage etc from the different offices, residential colonies of KoPT...26-June-2018
» Corrigendum-I
» Corrigendum-II
26-Jun-2018 12:21:00 17-Jul-2018 15:30:00 View
166 Misc. petty repairs at Nimak Mahal Quarters, Hydraulic Model Center, PSO Office Complex...21-June-2018   21-Jun-2018 16:55:00 18-Jul-2018 15:30:00 View
167 Fencing of two vacant plots (6-7-8 & 12) at Dhobitala Container Parking Area...20-June-2018   20-Jun-2018 10:45:00 06-Jul-2018 10:48:00 View
168 Development of Container Stacking Yard(Refer Park) at opposite of Shed no. 6 Dumayune Avenue...18-June-2018
» Corrigendum - I
» Corrigendum-II
18-Jun-2018 12:10:00 03-Jul-2018 15:30:00 View
169 Design, fabricate, supply , test and deliver at approved location at Kolkata Dock System...18-June-2018
» Corrigendum-I
18-Jun-2018 16:58:00 10-Jul-2018 15:30:00 View
170 Operation & maintenance of Water Treatment Plant at inside N.S. Dock near 4 NSD Gate...15-June-2018
» Corrigendum-I
15-Jun-2018 17:04:00 06-Jul-2018 15:30:00 View
171 Procurement of Furnitures at Estate Division, KDS in connection with contriving Office space...13-June-2018
» Tender Document
» Corrigendum - I
13-Jun-2018 16:40:00 25-Jun-2018 15:00:00 View
172 Reconstruction of Bay No. 4 & 5 of the CPY including reconstruction of damaged portions of Bay No. 1 CPY(excluding rail line portion) and other allied works...12-June-2018
» Corrigendum-I
» Corrigendum-II
12-Jun-2018 11:40:00 06-Jul-2018 15:30:00 View
173 Temporary Bamboo Walkway (XVII) at Basin Complex of Shore Based Pilot Station, at Sagar Island...11-June-2018
» Corrigendum-I
11-Jun-2018 12:45:00 06-Jul-2018 15:30:00 View
174 Providing fencing including repairing of existing boundary wall...06-June-2018   06-Jun-2018 16:27:00 18-Jun-2018 15:30:00 View
175 Providing assistance for upkeepment of office premises of Superintending Engineer...05-June-2018
» Corrigendum
05-Jun-2018 10:00:00 29-Jun-2018 15:30:00 View
176 Facelifting and Renovation of CVO's cabin excluding Toilet...05-June-2018   05-Jun-2018 17:00:00 12-Jun-2018 15:00:00 View
177 Supply of earthmovers/ mechanical excavator on hire , cutting jungles , supply of unskilled labourers...04-June-2018   04-Jun-2018 10:59:00 11-Jun-2018 15:30:00 View
178 Laying of new pipe line (underground ) to replace the old dilapilated worn out pipeline from bottom of water tank...04-June-218   04-Jun-2018 13:00:00 26-Jun-2018 15:30:00 View
179 Petty repairs of different roads of South Division to maintain the roads in a motorable condition...04-June-2018   04-Jun-2018 14:15:00 26-Jun-2018 15:30:00 View
180 Thorough repair and renovation to Hydraulic Power Station Toilet block...30-May-2018   30-May-2018 12:30:00 26-Jun-2018 15:30:00 View
181 Operation of fresh water centrifugal pump at Nimak Mahal Officers Qtrs. Campus...30-May-2018   30-May-2018 12:43:00 15-Jun-2018 15:30:00 View
182 Renovation/repairing/painting of the boundary wall including leveling and dressing of the area of NIWC...25-May-2018
» Corrigendum-I
25-May-2018 11:56:00 01-Jun-2018 15:30:00 View
183 Fencing of two vacant plots (6-7-8 and 12) at Dhobitala Container Parking Area...25-May-2018   25-May-2018 16:52:00 15-Jun-2018 15:30:00 View
184 Upgradation work including repainting of the entire quarter...22-May-2018
» Corrigendum-I
22-May-2018 10:17:00 05-Jun-2018 15:30:00 View
185 Construction of a clay tennis court including fencing...21-May-2018   21-May-2018 11:08:00 15-Jun-2018 15:30:00 View
186 Repairing & restoration of damaged road side drain at Dock-I (West) from Berth No. 2 KPD ...14-May-2018
» Corrigendum-II
18-May-2018 09:30:00 07-Jun-2018 14:00:00 View
187 Replacement of 20 Ton C.I. Stag Horn Bollards and MS Bull Rings...18-May-2018
» Corrigendum-I
18-May-2018 15:52:00 08-Jun-2018 15:30:00 View
188 Development of Garden at front area of Subhas Bhaban and Car Parking area...17-May-2018
» Corrigendum-I
17-May-2018 10:58:00 08-Jun-2018 15:30:00 View
189 Cleaning, desilting and disposal of silt, spoils etc. from drains outsides of docks...17-May-2018   17-May-2018 15:54:00 19-Jun-2018 15:30:00 View
190 Petty Miscellaneous works to KoPT Guest House (Both Old and New) and Officers club Building...14-May-2018   16-May-2018 09:30:00 06-Jun-2018 15:30:00 View
191 Development work for container stacking yard...16-May-2018   16-May-2018 10:50:00 07-Jun-2018 15:30:00 View
192 Facelifting and repairing of Shed No. 1, 5, 7, Nepal Godown...16-May-2018   16-May-2018 10:55:00 07-Jun-2018 15:30:00 View
193 Revamping of drainage system and leveling of depressed area...16-May-2018   16-May-2018 10:58:00 07-Jun-2018 15:30:00 View
194 Periodical jungle cutting, dressing, cleaning Water Hyacinth...15-May-2018   15-May-2018 10:43:00 08-Jun-2018 15:30:00 View
195 Repairing and reconstruction of damaged broken Boundary Wall...15-May-2018
» Corrigendum
15-May-2018 15:29:00 25-May-2018 15:30:00 View
196 Modification and renovation (as per revised plan) of Customs Building near gate no. 7 NSD...14-May-2018
» Corrigendum-I
14-May-2018 15:30:00 05-Jun-2018 15:30:00 View
197 Cleaning underground and above ground filter water reservoir at Centenary Hospital...14-May-2018
» Tender Document
» Corrigendum
» Corrigendum-II
14-May-2018 15:45:00 03-Jul-2018 15:00:00 View
198 Temporary Bamboo Walkway (XVII) at Basin Complex of Shore Based Pilot Station...11-May-2018   11-May-2018 10:42:00 05-Jun-2018 15:30:00 View
199 Cleaning of silt including removing of left over materials, Garbage mixed with rubbish and all other filthy materials...11-May-2018   11-May-2018 13:45:00 05-Jun-2018 15:30:00 View
200 Erection of additional fencing over the existing railing on both sides of Rabindra Setu...10-May-2018
» Corrigendum-I
10-May-2018 11:18:00 07-Jun-2018 15:30:00 View
201 Improvement of drainage system along main road...10-May-2018
» Corrigendum-I
» Corrigendum - II
10-May-2018 14:50:00 07-Jun-2018 15:30:00 View
202 Repairing & restoration of damaged road side drain...10-May-2018
» Corrigendum-I
10-May-2018 14:50:00 07-Jun-2018 15:30:00 View
203 Construction of Septic Tank and other plumbing and sanitary works...10-May-2018   10-May-2018 16:54:00 22-May-2018 15:00:00 View
204 Miscellaneous building , plumbing and sanitary repair works...08-May-2018   08-May-2018 10:30:00 29-May-2018 15:30:00 View
205 Upgradation work including repainting of the entire quarter...08-May-2018   08-May-2018 10:35:00 19-May-2018 15:30:00 View
206 One no. Main Pontoon of size 30.00m X 9.25m X 1.60m.(average depth) fitted with all fittings ...08-May-2018   08-May-2018 17:28:00 24-May-2018 15:30:00 View
207 Cutting and trimming branches of trees,etc.at Dock-I...04-May-2018   04-May-2018 11:30:00 16-May-2018 15:00:00 View
208 Thorough repairing of one number steel pontoon at Petroleum Wharves Budgebudge - 04-May-2018   04-May-2018 16:02:00 29-May-2018 15:30:00 View
209 Supply and installation of 'V' Type Fender and other allied works...04-May-2018   04-May-2018 17:09:00 29-May-2018 15:30:00 View
210 Petty Plumbing and Sanitary works at No. 8 Workshop...03-May-2018   03-May-2018 10:28:00 04-Jun-2018 15:30:00 View
211 Developing a portion of South side Lawn / Garden by making gravel pathway...02-May-2018   02-May-2018 10:20:00 04-May-2018 15:30:00 View
212 Petty plumbing & sanitary works as may be necessary at Subhas Nagar CISF Campus...02-May-2018   02-May-2018 12:05:00 10-May-2018 15:30:00 View
213 Thorough repairs and painting to the outside of Subhas Bhavan including boundary wall...26-April-2018   26-Apr-2018 10:41:00 17-May-2018 15:30:00 View
214 Erection/fixing of demarcation pillars and notification boards to...26-April-2018   26-Apr-2018 13:01:00 23-May-2018 15:30:00 View
215 Petty repairs of different roads of South Division to maintain the roads in a motorable condition...26-April-2018   26-Apr-2018 17:03:00 23-May-2018 17:30:00 View
216 Displaying various board/signal/placard/direction symbols at inside Dock...25-April-2018   25-Apr-2018 12:02:00 16-May-2018 15:30:00 View
217 Providing fencing with Angle Iron Post and Barbed wire around the three Plots...24-April-2018
» Corrigendum-I
» Corrigendum-II
24-Apr-2018 11:06:00 03-May-2018 15:30:00 View
218 Supply of one No. Lorry fitted with round shaped water tanker/water tanks with pump for sprinkling of water...24-April-2018   24-Apr-2018 11:25:00 16-May-2018 15:30:00 View
219 Repairing of damaged boundary wall as and when required...24-April-2018   24-Apr-2018 14:44:00 07-May-2018 15:30:00 View
220 Providing fencing including repairing of existing boundary wall...21-April-2018   21-Apr-2018 12:05:00 30-Apr-2018 15:30:00 View
221 Developing a portion of South side Lawn / Garden by making gravel pathway...21-April-2018   21-Apr-2018 11:45:00 25-Apr-2018 15:30:00 View
222 Reconstruction of Dock-I(West) internal road running along west side boundary wall...20-April-2018   20-Apr-2018 12:10:00 11-May-2018 15:30:00 View
223 Repairing & restoration of Dock East boundary road with mastic topping...20-April-2018   20-Apr-2018 12:15:00 11-May-2018 15:30:00 View
224 Construction of new boundary wall at the southern side of Alifnagar Crew's quarters...20-April-2018   20-Apr-2018 12:26:00 16-May-2018 15:30:00 View
225 Supply of daily labour for various sites of River Training wing...19-April-2018   19-Apr-2018 11:50:00 04-May-2018 15:30:00 View
226 Erection of temporary fencing along all sides of Boat Canal Area...19-April-2018   19-Apr-2018 12:48:00 17-May-2018 15:30:00 View
227 Developing a portion of South side Lawn / Garden by making gravel pathway...18-April-2018   17-Apr-2018 10:15:00 19-Apr-2018 15:30:00 View
228 Daily operation of sluice valve for supply of water....16-APR-2018   16-Apr-2018 14:50:00 07-May-2018 15:00:00 View
229 Facelifting of boundary wall (Outer and Inner Face) from C.G.R.Road Xing...13-April-2018   13-Apr-2018 10:47:00 08-May-2018 15:30:00 View
230 Waterproofing treatment work to the roof of Mooring Masters' Office...13-April-2018   13-Apr-2018 17:12:00 08-May-2018 15:30:00 View
231 Repairs to the internal roads at Dry Dock, Dock-I East, CMM...11-Apr-2018   11-Apr-2018 13:10:00 08-May-2018 15:30:00 View
232 Development of Garden at front area of Subhas Bhaban and Car Parking area...10-April-2018
» Corrigendum-I
10-Apr-2018 12:10:00 08-May-2018 15:30:00 View
233 Upkeeping of Camp premises, sheds/Building under Superintending Engineer (R.T) at Phalta Base Camp...   10-Apr-2018 12:50:00 10-May-2018 15:30:00 View
234 Petty Miscellaneous repairing works within Petroleum Wharf area at Budge Budge...10-April-2018   10-Apr-2018 17:28:00 02-May-2018 15:00:00 View
235 Repair to ther Diamond Harbour Jetty Pontoon...09-April-2018   09-Apr-2018 14:20:00 18-Apr-2018 15:30:00 View
236 Supply of unskilled labour at any location (both inside and outside Dock area ) for different miscellaneous works...06-April-2018   06-Apr-2018 10:40:00 17-Apr-2018 15:30:00 View
237 Cutting and trimming branches of trees...06-April-2018   06-Apr-2018 10:50:00 17-Apr-2018 15:00:00 View
238 Petty miscellaneous building repairing works as may be necessary at Portland Park Campus...06-April-2018   06-Apr-2018 12:40:00 26-Apr-2018 15:30:00 View
239 Thorough repair to the outside of buildings & waterproofing treatment work to the roof of buildings...05-April-2018   05-Apr-2018 16:00:00 27-Apr-2018 15:30:00 View
240 Construction of Toilet block with drinking water facility and rest shed at Coal Dock Road...04-April-2018   04-Apr-2018 11:15:00 26-Apr-2018 15:30:00 View
241 'V' Type Fender and other allied works at Approach Jetty...04-April-2018
» Corrigendum-I
» Corrigendum-II
04-Apr-2018 11:20:00 Tender has been Terminated View
242 Repairing & facelifting of old boundary wall...04-April-2018
» Corrigendum-I
04-Apr-2018 12:50:00 26-Apr-2018 15:30:00 View
243 Inside thorough Repairing of 51 C.G.R. Road office old building...04-April-2018   04-Apr-2018 12:55:00 26-Apr-2018 15:30:00 View
244 Provide service of labour at different areas for emergency misc. work...31-Mar-2018   31-Mar-2018 11:00:00 26-Apr-2018 15:30:00 View
245 Nourishment of Spur No. 92A at Moyapur Region...31-Mar-2018
» Corrigendum - I
» Corrigendum-II
31-Mar-2018 14:10:00 20-Apr-2018 15:30:00 View
246 Repairing of Deck joint plates of BASCULE BRIDGE (NAZRULSetu) at night...28-Mar-2018   28-Mar-2018 10:20:00 09-Apr-2018 15:30:00 View
247 Renovation and reconstruction of damaged Electrical switch room...28-Mar-2018   28-Mar-2018 10:25:00 06-Apr-2018 15:30:00 View
248 Operation & maintenance of Water Treatment Plant and Intake Pump....27-Mar-2018
» Corrigendum-I
27-Mar-2018 13:05:00 17-Apr-2018 15:00:00 View
249 Cleaning & Disinfection of Underground Vats. Overhead Fresh Water Tanks...27-Mar-2018   27-Mar-2018 13:10:00 06-Apr-2018 15:30:00 View
250 Miscellaneous plumbing & sanitary repair works at Port Land Quarters...27-Mar-2018
» Corrigendum & Addendum
27-Mar-2018 13:20:00 16-Apr-2018 15:30:00 View
251 Petty miscellaneous building repair works at Chetla Residential Complex...27-Mar-2018   27-Mar-2018 13:25:00 16-Apr-2018 15:30:00 View
252 Misc. petty repairs to different sheds and offices of CME Department...23-Mar-2018   23-Mar-2018 10:15:00 20-Apr-2018 15:30:00 View
253 Repairs to internal Road of Libyan ware House...23-Mar-2018   23-Mar-2018 10:20:00 17-Apr-2018 15:30:00 View
254 Upkeepment and maintenance of office of the Superintending Engineer...23-Mar-2018   23-Mar-2018 10:25:00 17-Apr-2018 15:30:00 View
255 Cleaning of silt including removing of left over materials, Garbage mixed with rubbish and all other filthy materials from the road side...23-Mar-2018   23-Mar-2018 10:40:00 17-Apr-2018 15:30:00 View
256 Supply of earthmovers/ mechanical excavator on hire, cutting jungles, supply of unskilled labours...23-Mar-2018   23-Mar-2018 10:55:00 17-Apr-2018 15:30:00 View
257 Civil Engineering accommodation and providing services of cook-cum-attendant in Civil Engineering Camp establishment...23-Mar-2018   23-Mar-2018 14:25:00 11-Apr-2018 15:30:00 View
258 Thorough repairs to the Dock Boundary wall starting from gate no- 6 to gate no-4...21-Mar-2018   21-Mar-2018 12:35:00 17-Apr-2018 15:30:00 View
259 Petty plumbing and sanitary works within Petroleum Wharf area at Budgebudge...20-Mar-2018   20-Mar-2018 10:02:00 02-Apr-2018 15:30:00 View
260 Technical services covering planning, designing and supervision of construction with allied works for Refurbishment of Head Office...20-Mar-2018
» Corrigendum
20-Mar-2018 15:03:00 24-Apr-2018 15:30:00 View
261 Construction of proposed Komagata Maru Memorial Building, Boundary wall...19-Mar-2018   19-Mar-2018 12:50:00 11-Apr-2018 15:30:00 View
262 Erection/fixing of demarcation pillars and notification boards...19-Mar-2018   19-Mar-2018 12:55:00 10-Apr-2018 15:30:00 View
263 Cutting of rank vegetation from compound premises including cleaning surface and uprooting of plants...17-March-2018   17-Mar-2018 10:49:00 27-Mar-2018 15:00:00 View
264 Design of 4NSD Gate At Netaji Subhas Dock...17-Mar-2018   17-Mar-2018 11:00:00 27-Mar-2018 15:30:00 View
265 Reconstruction of Dock-I(West) internal road running along west side boundary wall...16-Mar-2018   16-Mar-2018 16:15:00 10-Apr-2018 15:30:00 View
266 Repairing & restoration of Dock East boundary road...16-Mar-2018   16-Mar-2018 16:20:00 10-Apr-2018 15:30:00 View
267 Construction of new boundary wall at the southern side of Alifnagar Crew's quarters...15-Mar-2018   15-Mar-2018 10:57:00 06-Apr-2018 15:30:00 View
268 Thorough repair to the road from KoPT garrage to LRRS Building...15-Mar-2018   15-Mar-2018 11:06:00 05-Apr-2018 15:30:00 View
269 Dismantling of Old Condemned BISN Mazdoor Line up to Ground Level, Stacking of Bricks at Site...15-Mar-2018   15-Mar-2018 15:30:00 05-Apr-2018 15:30:00 View
270 Videography of Under-structure of Berth No 7 at Netaji Subhas Dock - 15-Mar-2018   15-Mar-2018 15:45:00 26-Mar-2018 15:30:00 View
271 Providing and fixing uPVC door, windows...15-Mar-2018   15-Mar-2018 16:50:00 19-Mar-2018 15:30:00 View
272 Thorough repairs of internal black top roads within Remount Road quarters' premises....13-Mar-2018   13-Mar-2018 13:00:00 05-Apr-2018 13:30:00 View
273 Facelifting of dock boundary wall from gate no.1 (K.P.D.-1) to Swinge bridge...13-Mar-18   13-Mar-2018 16:20:00 05-Apr-2018 15:30:00 View
274 Jungle cutting including uprooting and removing of vegetation,Grass,Bushes etc...13-Mar-2018   13-Mar-2018 16:30:00 06-Apr-2018 15:30:00 View
275 Operation of Pump Motor Set at A Shed reservoir including valve operation...13-Mar-18   13-Mar-2018 16:35:00 26-Mar-2018 15:30:00 View
276 Weedicide treatment along with Jungle Cutting in and around Petroleum Wharf area...13-Mar-2018   13-Mar-2018 17:15:00 03-Apr-2018 15:30:00 View
277 Maintenance day to day operation and other ancillary works at Water Treatment Plant...12-Mar-2018   12-Mar-2018 16:50:00 05-Apr-2018 15:30:00 View
278 Design , fabricate, supply, test, and deliver at approved location at Kolkata Dock System or at Budge Budge Moorings one no. Main Pontoon...09-Mar-2018   09-Mar-2018 12:15:00 03-Apr-2018 15:30:00 View
279 Repair and renovation to the outside and inside of shed no. 24...09-Mar-2018   09-Mar-2018 12:10:00 03-Apr-2018 15:30:00 View
280 Proposed Office for Estate Division at 1st Floor of Fairlie Warehouse for Bay No.4 - 08-Mar-2018   08-Mar-2018 11:40:00 29-Mar-2018 15:30:00 View
281 Civil works (replacement of existing doors and steel windows with alluminium doors and windows and other ancillary works) related to installation of A.C...06-Mar-2018   06-Mar-2018 16:34:00 28-Mar-2018 15:30:00 View
282 Inside repairs and painting to MM Division Office...05-Mar-2018   05-Mar-2018 11:55:00 27-Mar-2018 15:30:00 View
283 Face lifting and renovation of HO Canteen including Corridor...05-Mar-2018   05-Mar-2018 13:30:00 27-Mar-2018 15:30:00 View
284 Installation of fenders (both rubber & wooden) and necessary repairs to the damage approach jetty KPD...05-Mar-2018   05-Mar-2018 17:15:00 28-Mar-2018 15:30:00 View
285 Through Repairing and painting of over head Steel Tank at 5 no. and 9 no. NSD gate...02-March-2018
» Corrigendum - I
02-Mar-2018 11:55:00 27-Mar-2018 15:30:00 View
286 Petty Miscellaneous repairing works within Petroleum Wharf area at Budge Budge...03-Mar-2018   02-Mar-2018 12:20:00 23-Mar-2018 15:00:00 View
287 Repairing & face-lifting of Kantapukur barrack's presently occupied by CISF...02-Mar-2018   02-Mar-2018 12:25:00 27-Mar-2018 15:30:00 View
288 Petty plumbing and sanitary works at residential areas...28-Feb-2018   28-Feb-2018 11:30:00 13-Mar-2018 15:30:00 View
289 Removal / levelling of heaped up debris from different areas along the internal road side...24-Feb-2018   24-Feb-2018 10:45:00 22-Mar-2018 15:30:00 View
290 Replacement of old damaged G.C.I sheet by new G.C.I sheet...22-Feb-2018
» Corrigendum - I
22-Feb-2018 11:20:00 19-Mar-2018 15:30:00 View
291 Petty Misc repairs to shed building , goomties at Dock-II...22-Feb-2018   22-Feb-2018 12:20:00 21-Mar-2018 15:30:00 View
292 Construction of new boundary walls behind the Alifnagar Crew's quarters...21-Feb-2018   21-Feb-2018 11:20:00 15-Mar-2018 15:30:00 View
293 Thorough repair, renovation to both inside and outside of Allifnagar Marine Crew's Quarters...21-Feb-2018   21-Feb-2018 11:30:00 20-Mar-2018 15:30:00 View
294 Petty miscellaneous repairs to sheds, buildings, goomties...21-Feb-2018   21-Feb-2018 12:10:00 19-Mar-2018 15:30:00 View
295 Waterproofing treatment work to the roof of Mooring Masters' Office...21-Feb-2018   21-Feb-2018 12:30:00 19-Mar-2018 15:30:00 View
296 Misc. petty repairs to sheds, buildings Goomties etc. at Dock-I (West) area including infrastructure at Hide Road...21-Feb-2018
» Corrigendum - I
21-Feb-2018 12:35:00 20-Mar-2018 15:30:00 View
297 Operation & maintenance of Water Treatment Plant and Intake Pump...21-Feb-2018   21-Feb-2018 14:00:00 20-Mar-2018 15:30:00 View
298 Construction of proposed Komagata Maru Memorial Building, Boundary wall...19-Feb-2018   19-Feb-2018 14:30:00 15-Mar-2018 15:30:00 View
299 Cleaning operation of the entire inside & outside of Central Record & Documentary Centre...19-Feb-2018   19-Feb-2018 14:44:00 15-Mar-2018 15:30:00 View
300 Water Proofing Treatment to the Roof of Offices...16-Feb-2018   16-Feb-2018 11:45:00 08-Mar-2018 15:30:00 View
301 Anti-Termite treatment and Rodent control work at KoPT Head Office buildings.....15-Feb-2018
» Corrigendum
15-Feb-2018 10:05:00 07-Mar-2018 15:30:00 View
302 Miscellaneous conservancy upkeepment works inside K P dry Dock...15-Feb-2018   15-Feb-2018 11:40:00 09-Mar-2018 15:30:00 View
303 Beautification including maintenance of gardening at Phalta base camp and Swarupganj camp...14-Feb-2018   14-Feb-2018 13:10:00 06-Mar-2018 15:00:00 View
304 Facelifting of entrances , widening of Southside gate , cleaning of rubbish...14-Feb-2018   14-Feb-2018 16:55:00 20-Feb-2018 15:00:00 View
305 Petty Plumbing and Sanitary works at Dock-I(West), Dock-II, Island workshop area...13-Feb-2018   13-Feb-2018 10:00:00 21-Feb-2018 15:30:00 View
306 Replacement of 20 Ton C.I. Stag Horn Bollards & MS Bull Rings...13-Feb-2018   13-Feb-2018 12:20:00 08-Mar-2018 15:30:00 View
307 Misc.petty repairs to sheds,different Goomty/Office Bldgs,Electrical Substations...13-Feb-2018   13-Feb-2018 12:25:00 08-Mar-2018 15:30:00 View
308 Weedicide treatment along with Jungle Cutting in and around Petroleum Wharf area of Budge Budge...13-Feb-2018   13-Feb-2018 17:06:00 06-Mar-2018 15:30:00 View
309 Reconstruction of broken/damaged boundary wall of Fish Harbor Complex at Roychawk...12-Feb-2018   12-Feb-2018 11:55:00 22-Feb-2018 15:00:00 View
310 Cleaning & Disinfection of Underground Vats. Overhead Fresh Water Tanks...12-Feb-2018
» Corrigendum
» Corrigendum-II
12-Feb-2018 12:30:00 06-Mar-2018 15:30:00 View
311 Petty Plumbing and sanitary works at Sister Nivedita Abasan, Kantapukur and CISF Barrack...12-Feb-2018   12-Feb-2018 15:00:00 23-Feb-2018 15:30:00 View
312 Repair and renovation to the outside and inside of shed no. 23...09-Feb-2018   09-Feb-2018 15:52:00 07-Mar-2018 15:30:00 View
313 Repair and renovation to the outside and inside of shed no. 24...09-Feb-2018   09-Feb-2018 15:55:00 07-Mar-2018 15:30:00 View
314 Renovation and reconstruction of damaged Electrical switch room...08-Feb-2018   08-Feb-2018 10:58:00 19-Feb-2018 15:30:00 View
315 Providing & supplying different category of labourers with necessary tools & tackles...07-Feb-2018   07-Feb-2018 16:05:00 19-Feb-2018 15:30:00 View
316 Urgent repairing of damaged portion of ceiling and renovating damaged flooring of quarter No. 6 UF....07-Feb-2018   07-Feb-2018 16:10:00 19-Feb-2018 15:30:00 View
317 Making shallow drain to facilitate passage of water from the Lawn including construction...07-Feb-2018   07-Feb-2018 16:15:00 19-Feb-2018 15:00:00 View
318 Civil works related to installation of A.C...06-Feb-2018   06-Feb-2018 13:55:00 27-Feb-2018 15:30:00 View
319 Through repairs to the inside & outside of Customs Building (beside no. 7 Overhead tank)...05-Feb-2018   05-Feb-2018 10:30:00 20-Feb-2018 15:30:00 View
320 Pumping out of stagnated water from any location (both inside and outside Dock area)...05-Feb-2018   05-Feb-2018 13:30:00 16-Feb-2018 15:30:00 View
321 Maintenance of Garden at Dock Training Institute and Development & maintenance...05-Feb-2018   05-Feb-2018 14:10:00 15-Feb-2018 15:30:00 View
322 Petty repair works to Sister Nivedita Abasan, Sheds, Buildings, other structures...05-Feb-2018   05-Feb-2018 14:20:00 26-Feb-2018 15:30:00 View
323 Cleaning & dis-infecting G.I.,PVC, Masonry water reservoir, Steel Tank....05-Feb-2018   05-Feb-2018 17:30:00 26-Feb-2018 15:30:00 View
324 Misc. petty repairs at Subhas Bhavan complex in NSD for one year....03-Feb-2018   03-Feb-2018 15:30:00 28-Feb-2018 15:30:00 View
325 Development work in connection with Central Sector Scheme for Coastal Cargo...02-Feb-2018   02-Feb-2018 13:15:00 27-Feb-2018 15:30:00 View
326 Beautification including maintenance of gardening in the lawn area at Phalta base camp...01-Feb-2018   01-Feb-2018 15:45:00 12-Feb-2018 12:00:00 View
327 Petty Plumbing and sanitary works at Sister Nivedita Abasan, Kantapukur and CISF Barrack...30-Jan-2018   30-Jan-2018 14:00:00 09-Feb-2018 15:30:00 View
328 Providing Assistance for upkeepment of office premises of Superintending Engineer (Dev)...29-Jan-2018
» Corrigendum
29-Jan-2018 15:27:00 23-Feb-2018 15:30:00 View
329 Petty Plumbing and sanitary works at Sister Nivedita Abasan, Kantapukur and CISF Barrack...19-Jan-2018
» CORRIGENDUM-I
19-Jan-2018 11:38:00 30-Jan-2018 15:30:00 View
330 Modification of certain rooms of Administration Department & Finance Department...19-Jan-2018   19-Jan-2018 12:25:00 16-Feb-2018 15:30:00 View
331 Thorough repairing of C.F.S. office building both inside & outside...19-Jan-2018   19-Jan-2018 15:15:00 15-Feb-2018 15:30:00 View
332 Repair /maintenance work of paver block yards/roads/berth etc.....19-Jan-2018   19-Jan-2018 15:15:00 15-Feb-2018 15:30:00 View
333 Beautification including maintenance of gardening in the lawn area at Phalta base camp...18-Jan-2018   18-Jan-2018 15:00:00 31-Jan-2018 15:00:00 View
334 Reconstruction of Bay No. 1 (Excluding Rail Line Portion ), 4 , 5 of the CPY and other allied works...17-Jan-2018   17-Jan-2018 12:10:00 16-Feb-2018 15:30:00 View
335 Face lifting and renovation of HO Library including Corridor and Toilet...16-Jan-2018   16-Jan-2018 09:30:00 06-Feb-2018 15:30:00 View
336 Cleaning drains under South Division and other ancillary works as and when required for one year...16-Jan-2018   16-Jan-2018 12:20:00 06-Feb-2018 15:30:00 View
337 Maintenance day to day operation, providing services of night time watch & ward...16-Jan-2018   16-Jan-2018 12:25:00 06-Feb-2018 15:30:00 View
338 Thorough repairs to the Dock Boundary wall starting from gate no- 6 to gate no-3...16-Jan-2018   16-Jan-2018 12:50:00 06-Feb-2018 15:30:00 View
339 Repairs and face lifting to inside (86 units ) and outside of Building...16-Jan-2018   16-Jan-2018 17:00:00 09-Feb-2018 15:30:00 View
340 Rodent Control Treatment of all sheds at Dock-I (East &West) and Dock-II....10-Jan-2018   10-Jan-2018 11:45:00 06-Feb-2018 15:30:00 View
341 Maintenance of Deck joints at Rabindra Setu carriageway for the year 2017-18...10-Jan-2018   10-Jan-2018 10:50:00 06-Feb-2018 15:30:00 View
342 Repairs to damaged road surfaces at deck proper including both sides....10-Jan-2018   10-Jan-2018 11:55:00 06-Feb-2018 15:30:00 View
343 Emergency repair & replacement of worn out damaged wooden decking planks & steel works including painting...10-Jan-2018
» Corrigendum
10-Jan-2018 14:30:00 31-Jan-2018 15:00:00 View
344 Repairing of damaged Jetty No.8 of Petroleum Wharves Budge Budge...10-Jan-2017   10-Jan-2018 17:00:00 24-Jan-2018 15:30:00 View
345 Pumping out of stagnated water from any location (both inside and outside Dock area)....09-Jan-2018   09-Jan-2018 10:40:00 19-Jan-2018 15:30:00 View
346 Miscellaneous petty works at Rabindra Setu deck, approach footpath...28-Dec-2017   05-Jan-2018 09:30:00 05-Feb-2018 15:30:00 View
347 Painting Ply Boards at MA&HC, Fairley Warehouse - 05-Jan-2018
» Corrigendum
05-Jan-2018 14:45:00 18-Jan-2018 15:00:00 View
348 Removal of heaped up debris, removal of steel and unserviceable materials related to Civil Engineering works...05-Jan-2018   05-Jan-2018 16:00:00 18-Jan-2018 15:30:00 View
349 Patch repair to the carriage ways of different roads under K.P.Docks to maintain them in good motorable condition...04-Jan-2018   04-Jan-2018 10:20:00 30-Jan-2018 15:30:00 View
350 Misc. conservancy upkeepment work at Portland Park quarters' premises...04-Jan-2018   04-Jan-2018 11:00:00 30-Jan-2018 15:30:00 View
351 Painting to inside and outside of MS overhead water tanks including the supporting MS structure...04-Jan-2018   04-Jan-2018 11:10:00 30-Jan-2018 15:30:00 View
352 Development work in connection with Central Sector Scheme for Coastal Cargo...04-Jan-2018   04-Jan-2018 17:00:00 30-Jan-2018 15:30:00 View
353 Petty plumbing and sanitary works within Petroleum Wharf area at Budgebudge...03-Jan-2018   03-Jan-2018 10:50:00 22-Jan-2018 15:00:00 View
354 Development work for container stacking yard at the area of the erstwhile BISN Mazdoor Line....29-Dec-2017   29-Dec-2017 16:05:00 25-Jan-2018 15:30:00 View
355 Repairing to the approach road of Century Ply from Jainkunj Rail Line Crossing to CFS Sonai main gate...26-Dec-2017
» Corrigendum-I
26-Dec-2017 15:15:00 30-Jan-2018 15:30:00 View
356 Misc. Conservancy upkeepment work at the Majerhat Centenary Hospital comppound...22-Dec-2017   22-Dec-2017 13:10:00 16-Jan-2018 15:30:00 View
357 Thorough repairs and renovation including plumbing and sanitary works to inside of flat Nos. 1GF and 1 FF ....22-Dec-2017   22-Dec-2017 13:15:00 16-Jan-2018 15:30:00 View
358 Cleaning septic tanks, inspection pits etc. & providing services of pump....18-Dec-2017   18-Dec-2017 14:50:00 03-Jan-2018 15:15:00 View
359 Thorough improvement & upgradation of Transport Depot Road...15-Dec-2017   15-Dec-2017 15:30:00 09-Jan-2018 15:30:00 View
360 Beautification including maintenance of gardening in the lawn area at Phalta base camp...13-Dec-2017   13-Dec-2017 14:40:00 05-Jan-2018 15:00:00 View
361 Geotechnical examination at Swarupganj discharge measuring station...13-Dec-2017   13-Dec-2017 15:20:00 17-Jan-2018 15:30:00 View
362 Petty Miscellaneous repair works for New Colony and other ancillary works as and when required at Taratala Quarters...13-Dec-2017   13-Dec-2017 15:55:00 05-Jan-2018 15:30:00 View
363 Replacement of 20 Ton C.I. Stag Horn Bollards & MS Bull Rings...13-Dec-2017   13-Dec-2017 15:55:00 05-Jan-2018 15:30:00 View
364 Facility management works at the offices of Dock Workers' Training Institute...13-Dec-2017   13-Dec-2017 16:00:00 05-Jan-2018 15:30:00 View
365 Removal / levelling of heaped up debris from different areas along the internal road side of N.S. Dock...12-Dec-2017   12-Dec-2017 16:30:00 15-Jan-2018 15:30:00 View
366 Thorough renovation to the inside and outside of Hilary Institute....11-Dec-2017   11-Dec-2017 11:30:00 30-Dec-2017 15:30:00 View
367 Expression of Interest (EOI) For Design and Construction of 4NSD and 8NSD Gate At Netaji Subhas Dock...09-Dec-2017
» Corrigendum-I
09-Dec-2017 12:55:00 17-Jan-2018 15:30:00 View
368 Selection of Consultant for Preparation of Techno-Economic Feasibility Report(TEFR)...08-Dec-2017
» Corrigendum-I
» Corrigendum-II
» Corrigendum-III
» Corrigendum-IV
» Notice
08-Dec-2017 15:00:00 03-Apr-2018 15:00:00 View
369 Inside & Outside thorough repairing of 1(D. C. Port Office) & 2-6 Dumayune Avenue Quarters & 7 No. Dumayune Avenue Qtr...07-Dec-2017   07-Dec-2017 13:00:00 27-Dec-2017 15:30:00 View
370 Repair and renovation of damaged/ worn out fencing within ISPS zone of Petroleum Wharves...07-Dec-2017   07-Dec-2017 15:15:00 27-Dec-2017 15:30:00 View
371 Cleaning & dis-infecting G.I., PVC, Masonry water reservoir, Steel Tank....05-Dec-2017
» Corrigendum-I
05-Dec-2017 10:50:00 27-Dec-2017 15:30:00 View
372 Maintenance of Deck joints at Rabindra Setu carriageway...05-Dec-2017   05-Dec-2017 10:55:00 27-Dec-2017 15:30:00 View
373 Repairs to damaged road surfaces at deck proper including both sides...05-Dec-2012   05-Dec-2017 11:00:00 27-Dec-2017 15:30:00 View
374 Rodent Control Treatment of all sheds at Dock-I (East &West) and Dock-II...04-Dec-2017   04-Dec-2017 12:20:00 20-Dec-2017 15:30:00 View
375 Replacement of damaged sewer line including cleaning of septic tank at Sister Nivedita Abasan...01-Dec-2017   01-Dec-2017 10:40:00 27-Dec-2017 15:30:00 View
376 Repairs to Approach Road starting from 7, N S D Gate to 5, N S D Gate up to CGR Road..01-Dec-2017   01-Dec-2017 10:45:00 27-Dec-2017 15:30:00 View
377 Thorough repairs to inside of 'A' & 'B' Blocks of Sister Nivedita Abasan....01-Dec-2017   01-Dec-2017 10:45:00 27-Dec-2017 15:30:00 View
378 Miscellaneous building repair works as may be necessary at Subhash Nagar CISF Qtrs....01-Dec-2017   01-Dec-2017 10:55:00 27-Dec-2017 15:30:00 View
379 Petty miscellaneous repair works including plumbing and sanitary works at KoPT Campus at Sagar Island...01-Dec-2017   01-Dec-2017 15:35:00 11-Dec-2017 15:30:00 View
380 Geotechnical examination at Swarupganj discharge measuring station of Kolkata Port Trust....01-Dec-2017   01-Dec-2017 15:45:00 07-Dec-2017 15:30:00 View
381 Petty plumbing and sanitary works at Dock-1(East), Dry Dock area and C.M.M...28-Nov-2017   28-Nov-2017 15:10:00 08-Dec-2017 15:30:00 View
382 Emergency repair & replacement of worn out damaged wooden decking planks...24-Nov-2017   24-Nov-2017 17:28:00 15-Dec-2017 15:00:00 View
383 Patch repair to the carriage ways of different roads...23-Nov-2017   23-Nov-2017 10:44:00 20-Dec-2017 15:30:00 View
384 Modification of certain rooms of Administration Department and Finance Department at ground floor and first floor of KoPT Head Office old building for required provision of Air Conditioning...23-Nov-2017   23-Nov-2017 14:40:00 20-Dec-2017 15:30:00 View
385 Reconstruction of Oil Installation Road including side drain...23-Nov-2017   23-Nov-2017 15:00:00 12-Dec-2017 15:30:00 View
386 Restoration and strengthening of Kantapukur Main Road inside Kantapukur Shed area...23-Nov-2017   23-Nov-2017 15:25:00 12-Dec-2017 15:30:00 View
387 Thorough improvement & upgradation of Transport Depot Road...23-Nov-2017   23-Nov-2017 15:35:00 12-Dec-2017 15:30:00 View
388 Periodical cleaning & disinfecting underground & above ground Filter Water Reservoir / Tanks....22-Nov-2017   22-Nov-2017 10:00:00 01-Dec-2017 15:30:00 View
389 Renewing damaged portions of Durmah Mat walling over perimeter walls..22-Nov-2017   22-Nov-2017 10:10:00 01-Dec-2017 15:30:00 View
390 Beautification including maintenance of gardening in the lawn area at Phalta base camp...22-Nov-2017   22-Nov-2017 14:20:00 06-Dec-2017 15:00:00 View
391 Facility management works at the offices of...21-Nov-2017   21-Nov-2017 11:40:00 12-Dec-2017 15:30:00 View
392 Painting to inside and outside of MS overhead water tanks...21-Nov-2017   21-Nov-2017 11:45:00 12-Dec-2017 15:30:00 View
393 Petty Miscellaneous repairing works at Centenary Hospital...21-Nov-2017   21-Nov-2017 11:50:00 12-Dec-2017 15:30:00 View
394 Petty plumbing and sanitary works at Dock-1(East), Dry Dock area and C.M.M...16-Nov-2017   16-Nov-2017 12:45:00 27-Nov-2017 15:30:00 View
395 Supply of one Total Station and one Auto Level to Civil Engineering Department...16-Nov-2017   16-Nov-2017 15:45:00 18-Dec-2017 15:30:00 View
396 Annual jungle cleaning of sector-I. II, IV, V and new colony at Taratala colony...15-Nov-2017
» Corrigendum
» Corrigendum - II
15-Nov-2017 14:00:00 24-Nov-2017 15:05:00 View
397 Repairing of damaged Jetty No.8 of Petroleum Wharves Budge Budge (PWBB)..14-Nov-2017   14-Nov-2017 17:00:00 04-Dec-2017 15:30:00 View
398 Through repair renovation and face lifting of fire qtr A and B block...13-Nov-2017   13-Nov-2017 16:20:00 06-Dec-2017 15:30:00 View
399 Requirement of seeds (flowers and vegetables) manures and fertilizers, insecticides and pesticides...13-Nov-2017   13-Nov-2017 17:00:00 06-Dec-2017 15:30:00 View
400 Waterproofing treatment work to the roof...08-Nov-2017   08-Nov-2017 12:20:00 06-Dec-2017 15:30:00 View
401 Emergency removal of accumulated Earth/Garbage mixed with rubbish...06-Nov-2017   06-Nov-2017 13:50:00 16-Nov-2017 15:30:00 View
402 Petty Plumbing and Sanitary works inside N.S. Dock...03-Nov-2017   03-Nov-2017 13:40:00 29-Nov-2017 15:30:00 View
403 Facility management works at the Head office compound...02-Nov-2017   02-Nov-2017 13:10:00 23-Nov-2017 15:30:00 View
404 Repairs to damaged road surfaces at deck proper including both sidesâ approaches of Rabindra Setu...02-Nov-2017   02-Nov-2017 15:00:00 30-Nov-2017 15:30:00 View
405 Thorough repairs to the Dhobitala Road including other allied works, N.s. Docks....02-Nov-2017   02-Nov-2017 15:05:00 27-Nov-2017 15:30:00 View
406 Petty Miscellaneous repair works for New Colony and other ancillary works...02-Nov-2017   02-Nov-2017 16:54:00 28-Nov-2017 15:30:00 View
407 Replacement of 20 Ton C.I. Stag Horn Bollards & MS Bull Rings...02-Nov-2017   02-Nov-2017 16:56:00 28-Nov-2017 15:30:00 View
408 Jungle cutting,Surface dressing,uproot and remove plants at Coal Berth area...31-Oct-2017   31-Oct-2017 15:15:00 11-Nov-2017 15:30:00 View
409 Providing & supplying different category of labourers with necessary tools & tackles...31-Oct-2017   31-Oct-2017 17:33:00 10-Nov-2017 15:30:00 View
410 Providing services for upkeepment of office premises of Superintending Engineer(Civil)...31-Oct-2017
» Corrigendum
31-Oct-2017 17:35:00 15-Dec-2017 15:15:00 View
411 Petty plumbing and sanitary works within Petroleum Wharf area at Budgebudge...28-Oct-2017
» Corrigendum
28-Oct-2017 11:20:00 17-Nov-2017 15:00:00 View
412 Maintenance of Deck joints at Rabindra Setu carriageway for the year 2017-18...26-Oct-2017   26-Oct-2017 15:15:00 27-Nov-2017 15:30:00 View
413 Petty plumbing and sanitary works as may be necessary at Centenary Hospital...26-Oct-2017   26-Oct-2017 17:25:00 08-Nov-2017 15:05:00 View
414 Modification of certain rooms of Administration Department...25-Oct-2017
» Corrigendum-I
25-Oct-2017 10:30:00 17-Nov-2017 15:30:00 View
415 Construction of barbed wire fencing with concrete post at Bhut Ghat Truck Terminal...25-Oct-2017   25-Oct-2017 13:30:00 15-Nov-2017 15:30:00 View
416 Petty plumbing works as may be necessary at Taratala colony...23-Oct-2017   23-Oct-2017 10:50:00 03-Nov-2017 15:05:00 View
417 Petty miscellaneous Civil works to Head Office Main building...23-Oct-2017   23-Oct-2017 11:50:00 06-Nov-2017 15:30:00 View
418 Petty Plumbing and sanitary works within KoPT Head Office premises...23-Oct-2017   23-Oct-2017 11:55:00 06-Nov-2017 15:30:00 View
419 Thorough renovation to the inside and outside of Hilary Institute - 23-Oct-2017   23-Oct-2017 11:57:00 06-Nov-2017 15:30:00 View
420 Providing upkeepment and maintenance of the office under Superintending Engineer (Rly)...23-Oct-2017   23-Oct-2017 14:30:00 14-Nov-2017 15:05:00 View
421 Thorough repairs to inside of A & B Blocks of Sister Nivedita Abasan...16-Oct-2017   16-Oct-2017 11:20:00 07-Nov-2017 15:30:00 View
422 Patch repair to the carriage ways of different roads under K.P.Docks...14-Oct-2017   14-Oct-2017 11:05:00 17-Nov-2017 15:30:00 View
423 Thorough repairs and face lifting to inside (86 units) and outside of Building...13-Oct-2017   13-Oct-2017 12:30:00 07-Nov-2017 15:30:00 View
424 Jungle cutting, uprooting and removing plants at Dock-I (West)....13-Oct-2017   13-Oct-2017 15:00:00 24-Oct-2017 15:30:00 View
425 Inside and outside repairs and renovation including sanitary & plumbing works...12-Oct-2017   12-Oct-2017 12:40:00 31-Oct-2017 15:30:00 View
426 Renovation of Crewâs block and water proofing treatment to roof of Pilot house...12-Oct-2017   12-Oct-2017 16:35:00 07-Nov-2017 15:30:00 View
427 Strengthening of East Peripherial Road at the eastern side of Basra Yard...12-Oct-2017   12-Oct-2017 17:15:00 10-Nov-2017 15:30:00 View
428 Thorough outside repairs and renovation of including sanitary & plumbing works...12-Oct-2017   12-Oct-2017 17:20:00 10-Nov-2017 15:30:00 View
429 Repairing and renewal of damaged Coping Stones at berth no 2 and 3...12-Oct-2017   12-Oct-2017 17:22:00 14-Nov-2017 15:30:00 View
430 Supply of one Total Station and one Auto Level to Civil Engineering Department....11-Oct-2017   11-Oct-2017 10:10:00 07-Nov-2017 15:30:00 View
431 Through renovation to the Site Office of Superintending Engineer....11-Oct-2017   11-Oct-2017 10:20:00 07-Nov-2017 15:30:00 View
432 Facelifting of adjacent dock boundary wall at both side of Bascule Bridge...11-Oct-2017   11-Oct-2017 17:00:00 07-Nov-2017 15:30:00 View
433 Providing Assistance for up-keepment of office premises of Superintending Engineer...09-Oct-2017   09-Oct-2017 12:56:00 18-Oct-2017 15:30:00 View
434 Emergency removal of accumulated Earth/Garbage mixed with rubbish...09-Oct-2017   09-Oct-2017 15:10:00 18-Oct-2017 15:30:00 View
435 Repairing to the approach road of Century Ply...04-Oct-2017   04-Oct-2017 10:45:00 31-Oct-2017 15:30:00 View
436 Thorough repairs to the Dhobitala Road...04-Oct-2017   04-Oct-2017 11:00:00 27-Oct-2017 15:30:00 View
437 Mowing lawns of Portland Park Campus...04-Oct-2017   04-Oct-2017 12:30:00 16-Oct-2017 15:00:00 View
438 Fulfilling requirement of seeds (flowers and vegetables) manures and fertilizers...26-Sept-2017   26-Sep-2017 12:05:00 06-Oct-2017 15:00:00 View
439 Cleaning and removing accumulated muck etc. From Bridge deck...25-Sept-2017   25-Sep-2017 16:35:00 27-Oct-2017 15:30:00 View
440 Repairs to damaged road surfaces at deck proper including both sides' approaches of Rabindra Setu...22-Sept-2017   22-Sep-2017 14:41:00 27-Oct-2017 15:30:00 View
441 Sinking of tubes well...21-Sept-2017   21-Sep-2017 13:20:00 11-Oct-2017 15:30:00 View
442 Waterproofing treatment work to the roof...21-Sept-2017
» Corrigendum-I
21-Sep-2017 15:00:00 17-Oct-2017 15:30:00 View
443 General up-keepment of the Chief Engineer's Office...21-Sept-2017   21-Sep-2017 15:40:00 17-Oct-2017 15:30:00 View
444 Repairs to Approach Road starting from 7, N S D Gate to 5, N S D Gate up to CGR Road...21-Sept-2017   21-Sep-2017 15:50:00 17-Oct-2017 15:30:00 View
445 Supplying drinking water at different places by Water Tanker...21-Sept-2017   21-Sep-2017 15:55:00 17-Oct-2017 15:30:00 View
446 Providing & supplying different category of labourers...20-Sept-2017   20-Sep-2017 15:50:00 06-Oct-2017 15:30:00 View
447 Miscellaneous. Petty plumbing and sanitary works as may be necessary at Centenary Hospital....16-Sept-2017   16-Sep-2017 10:30:00 26-Sep-2017 15:05:00 View
448 Petty plumbing works as may be necessary at Taratala colony...15-Sept-2017
» Corrigendum
15-Sep-2017 16:50:00 26-Sep-2017 15:05:00 View
449 Development of Garden at 51,C.G.R.Road Civil Engineering Dock Office....14-Sept-2017   14-Sep-2017 10:40:00 22-Sep-2017 15:30:00 View
450 Emergency removal of accumulated Earth/Garbage mixed with rubbish...14-Sept-2017   14-Sep-2017 15:10:00 22-Sep-2017 15:30:00 View
451 Periodical jungle cutting and removing jungles at different areas of N.S. Dock...13-Sept-2017   13-Sep-2017 10:35:00 16-Oct-2017 15:30:00 View
452 Strengthening of East Peripherial Road at the eastern side of Basra Yard...13-Sept-2017   13-Sep-2017 11:10:00 10-Oct-2017 15:30:00 View
453 Re-construction of broken portion of permanent masonry wall...13-Sept-2017   13-Sep-2017 12:30:00 10-Oct-2017 15:30:00 View
454 Replacement of damaged sewer line including cleaning of septic tank at Sister Nivedita Abasan....13-Sept-2017   13-Sep-2017 14:35:00 10-Oct-2017 15:30:00 View
455 Beautification including maintenance of gardening in the lawn area at Phalta base camp....13-Sept-2017   13-Sep-2017 14:45:00 04-Oct-2017 15:00:00 View
456 Construction of a Meter room at Bhut Ghat Truck Terminal....13-Sept-2017   13-Sep-2017 14:55:00 03-Oct-2017 15:30:00 View
457 Fixing of vitrified tiles to the floor of the guest house...13-Sept-2017   13-Sep-2017 17:23:00 10-Oct-2017 15:30:00 View
458 Maintenance of existing landscape and garden...12-Sept-2017   12-Sep-2017 12:55:00 10-Oct-2017 15:15:00 View
459 Thorough repairing and up-gradation of Strand Bank Road...11-Sept-2017   11-Sep-2017 12:15:00 04-Oct-2017 15:30:00 View
460 Repair & renovation of the rooms of 2nd. floor at Subhas Bhavan...08-Sept-2017   08-Sep-2017 15:05:00 10-Oct-2017 15:30:00 View
461 Petty miscellaneous repair works including plumbing and sanitary works...08-Sept-2017   08-Sep-2017 15:30:00 10-Oct-2017 15:30:00 View
462 Petty Plumbing & Sanitary works of Subhas Bhavan, P-65, PSO Complex...07-Sept-2017   07-Sep-2017 10:30:00 10-Oct-2017 15:30:00 View
463 Thorough repairs and face lifting to inside (86 units ) and outside of Building....07-Sept-2017   07-Sep-2017 16:35:00 04-Oct-2017 15:30:00 View
464 Supply of one Total Station and one Auto Level...06-Sept-2017
» Corrigendum-I
06-Sep-2017 14:05:00 04-Oct-2017 15:30:00 View
465 Construction of two nos.new Toilet Blocks...06-Sept-2017
» Corrigendum
06-Sep-2017 14:15:00 06-Oct-2017 15:30:00 View
466 Construction of 2 nos. new Toilet Block and other ancillary work...06-Sept-2017
» Corrigendum
06-Sep-2017 14:20:00 06-Oct-2017 15:30:00 View
467 Construction of a Rest Shed-Office...06-Sept-2017
» Corrigendum
06-Sep-2017 14:25:00 04-Oct-2017 15:30:00 View
468 Cleaning / removing chokage of underground drainage system...04-Sept-2017   04-Sep-2017 14:00:00 09-Oct-2017 15:30:00 View
469 Emergency patch repairs to Taratala road from Jhinjira Bazaar...04-Sept-2017   04-Sep-2017 14:20:00 11-Sep-2017 15:30:00 View
470 Emergency patch repairs to Transport Depot Road of South Section....01-Sep-2017   01-Sep-2017 11:10:00 05-Sep-2017 15:30:00 View
471 Miscellaneous repairing and cleaning work at 6 NSD Berth for handling vessels...31-Aug-2017   31-Aug-2017 10:00:00 03-Oct-2017 15:30:00 View
472 Through renovation to the Site Office of Superintending Engineer (Rlys.)....31-Aug-2017
» Corrigendum
» Corrigendum-II
31-Aug-2017 19:50:00 04-Oct-2017 15:30:00 View
473 Emergency removal of accumulated Earth/Garbage....30-Aug-2017
» Corrigendum -I
30-Aug-2017 13:00:00 12-Sep-2017 15:30:00 View
474 Repairing to the approach road of Century Ply from Jainkunj Rail Line Crossing to CFS Sonai main gate...30-Aug-2017
» Corrigendum
» Corrigendum-II
30-Aug-2017 14:50:00 26-Sep-2017 15:30:00 View
475 Thorough outside repairs and renovation of including sanitary & plumbing works...30-Aug-2017
» Corrigendum
30-Aug-2017 14:55:00 26-Sep-2017 15:30:00 View
476 Repairing and renewal of damaged Coping Stones at berth no 2 and 3...30-Aug-2017
» Corrigendum
30-Aug-2017 15:00:00 03-Oct-2017 15:30:00 View
477 Construction of barbed wire fencing with concrete post at Bhut Ghat Truck Terminal...30-Aug-2017
» Corrigendum
30-Aug-2017 15:20:00 22-Sep-2017 15:30:00 View
478 Providing services for general upkeepment (Attendant and House Keepers ) for maintenance...30-Aug-2017
» Corrigendum
30-Aug-2017 15:25:00 22-Sep-2017 15:30:00 View
479 Thorough repairing and renovation of office and Crewâs quarter...30-Aug-2017
» Corrigendum
30-Aug-2017 15:30:00 22-Sep-2017 15:30:00 View
480 Emergency patch repairs to Taratala road from Jhinjira Bazaar to Ramnagar crossing....29-Aug-2017   29-Aug-2017 11:40:00 01-Sep-2017 15:30:00 View
481 Providing Soling with departmental old Paver Block / Concrete Block...29-Aug-2017   29-Aug-2017 13:20:00 22-Sep-2017 15:30:00 View
482 Sinking of tubes well...29-Aug-2017   29-Aug-2017 14:52:00 12-Sep-2017 15:30:00 View
483 Emergency patch repairs of New road stretching...29-Aug-2017
» Corrigendum
29-Aug-2017 16:00:00 07-Sep-2017 15:30:00 View
484 Repairs to the damaged height restriction barriers at both side of Swinge Bridge....28-Aug-2017   28-Aug-2017 12:35:00 06-Sep-2017 15:00:00 View
485 Face-lifting of adjacent dock boundary wall at both side of Bascule Bridge...24-Aug-2017   24-Aug-2017 12:50:00 15-Sep-2017 15:30:00 View
486 Repair and renovation of the rooms of 2nd. floor at Subhas Bhavan...23-Aug-2017   23-Aug-2017 12:30:00 07-Sep-2017 15:30:00 View
487 Beautification including maintenance of gardening in the lawn area at Phalta base camp...23-Aug-2017   23-Aug-2017 13:45:00 05-Sep-2017 15:00:00 View
488 Emergency Remodelling of Electrical Panel Room of Bascule Bridge...22-Aug-2017   22-Aug-2017 13:45:00 01-Sep-2017 15:00:00 View
489 Repair of the areas outside Gate No. 8, NSD and 8 NSD Rail Gate...22-Aug-2017
» Corrigendum
22-Aug-2017 16:00:00 15-Sep-2017 15:30:00 View
490 Misc. conservancy upkeepment work at the Dumayune Avenue quartersâ premises...22-Aug-2017
» Corrigendum
22-Aug-2017 17:15:00 15-Sep-2017 15:30:00 View
491 Supplying drinking water at different places by Water Tanker...22-Aug-2017
» Corrigendum
22-Aug-2017 17:20:00 15-Sep-2017 15:30:00 View
492 General up-keepment of the Chief Engineerâs Office...22-Aug-2017
» Corrigendum - I
22-Aug-2017 17:25:00 15-Sep-2017 15:30:00 View
493 Emergency patch repairs to Transport Depot Road of South Section...19-Aug-2017   19-Aug-2017 10:00:00 28-Aug-2017 15:30:00 View
494 Repair and renovation to the outside and inside of shed...18-Aug-2017
» Corrigendum
» Corrigendum-II
18-Aug-2017 13:25:00 15-Sep-2017 15:30:00 View
495 Providing Movable Security Booths...18-Aug-2017   18-Aug-2017 14:00:00 29-Aug-2017 15:00:00 View
496 Providing new sewer line in replacement of permanently chocked/ damaged portion of the existing sewer line..17-Aug-2017   17-Aug-2017 16:40:00 28-Aug-2017 15:00:00 View
497 Water Treatment Plant at inside N.S. Dock near 4 NSD Gate...16-Aug-2017   16-Aug-2017 11:30:00 24-Aug-2017 15:30:00 View
498 Repairs to the damaged height restriction barriers at both side of Swinge Bridge...16-Aug-2017   16-Aug-2017 12:00:00 25-Aug-2017 15:00:00 View
499 Development work for container stacking...16-Aug-2017
» Corrigendum
16-Aug-2017 14:00:00 08-Sep-2017 15:30:00 View
500 Replacement of old damaged G.C.I. sheet in shed...16-Aug-2017
» Corrigendum
» Corrigendum -II
16-Aug-2017 13:50:00 08-Sep-2017 15:30:00 View
501 Strengthening of East Peripherial Road at the eastern side of Basra Yard...16-Aug-2017
» Corrigendum
16-Aug-2017 16:40:00 07-Sep-2017 15:30:00 View
502 Repairing and replacement of damaged fenders...16-Aug-2017
» Corrigendum -I
16-Aug-2017 16:45:00 07-Sep-2017 15:30:00 View
503 Temporary Bamboo Walkway (XVI) at Basin Complex of Shore Based Pilot Station...11-Aug-2017
» Corrigendum - I
11-Aug-2017 12:50:00 24-Aug-2017 15:30:00 View
504 Construction of proposed Tidal Observatory station and other allied work...11-Aug-2017
» Corrigendum - I
» Corrigendum -II
11-Aug-2017 15:20:00 06-Sep-2017 15:30:00 View
505 Emergency patch repair to the outside approach of Gate No. 8 NSD...10-Aug-2017   10-Aug-2017 15:00:00 17-Aug-2017 15:30:00 View
506 Strengthening of East Peripherial Road at the eastern side....15-July-2017   15-Jul-2017 10:30:00 17-Jul-2017 15:30:00 View
507 Reconstruction of Bay No. 1 (Excluding Rail Line Portion ), 4 , 5 of the CPY...15-July-2017   15-Jul-2017 10:40:00 17-Jul-2017 15:30:00 View
508 Facelifting of entrances , widening of Southside gate , cleaning of rubbish...23-June-2017   23-Jun-2017 12:50:00 03-Jul-2017 15:00:00 View
509 Measures for Security arrangement and thorough renovation of the Generator room...23-June-2017   23-Jun-2017 14:40:00 18-Jul-2017 15:30:00 View
510 Pumping out of waste water from Pits, manhole, drain etc...22-JUN-2017   22-Jun-2017 16:40:00 12-Jul-2017 15:00:00 View
511 Construction of a Meter room at Bhut Ghat Truck Terminal...20-June-2017   20-Jun-2017 14:30:00 03-Jul-2017 15:30:00 View
512 Painting to inside and outside of MS overhead water tanks...20-June-2017   20-Jun-2017 15:41:00 18-Jul-2017 15:30:00 View
513 General Maintenance, Up keeping of Camp premises...19-June-2017
» Corrigendum
19-Jun-2017 17:05:00 05-Jul-2017 15:30:00 View
514 Periodical Slot Marking and Crane Track Marking work...16-June-2017   16-Jun-2017 15:30:00 20-Jul-2017 15:30:00 View
515 Operation & maintenance of Water Treatment Plant at inside N.S. Dock...14-June-2017   14-Jun-2017 13:05:00 06-Jul-2017 15:30:00 View
516 Patch repair to the carriage ways of different roads...14-June-2017   14-Jun-2017 15:10:00 08-Jul-2017 15:30:00 View
517 Repairing and replacement of damaged fenders and supplying, fixing S/H lorry/tractor tyre and other miscellaneous work...14-June-2017   14-Jun-2017 15:15:00 08-Jul-2017 15:30:00 View
518 Repair to damaged portion of Dock Boundary Wall near Gate No. 9...13-June-2017   13-Jun-2017 12:50:00 10-Jul-2017 15:30:00 View
519 Provide service of labour at different areas for emergency misc. work...12-June-2017
» Corrigendum
12-Jun-2017 17:35:00 23-Jun-2017 15:30:00 View
520 Construction of proposed Tidal Observatory station and other allied work at Roychak...09-Jun-2017   09-Jun-2017 15:20:00 06-Jul-2017 15:30:00 View
521 Temporary Bamboo Walkway (XVI) at Basin Complex of Shore Based Pilot Station...09-Jun-2017   09-Jun-2017 15:25:00 06-Jul-2017 15:30:00 View
522 Operation of fresh water Centrifugal pump at Nimak Mahal Officersâ Qtrs. Campus...07-Jun-2017   07-Jun-2017 12:00:00 19-Jun-2017 15:30:00 View
523 Construction of a masonry boundary wall...05-June-2017   05-Jun-2017 17:10:00 26-Jun-2017 15:30:00 View
524 Removal / levelling of heaped up debris from different areas along the internal road side of N.S. Dock in connection with SWACCH BHARAT mission...02-Jun-2017   02-Jun-2017 10:30:00 29-Jun-2017 15:30:00 View
525 Cleaning of silt including removing of leftover materials, garbage mixed with rubbish...02-June-2017   02-Jun-2017 11:30:00 27-Jun-2017 15:30:00 View
526 Pumping out of waste water from Pits, manhole, drain...02-June-2017   02-Jun-2017 17:15:00 20-Jun-2017 15:00:00 View
527 Re-construction of broken portion of permanent masonry wall and at damaged portions...31-May-2017   31-May-2017 11:30:00 28-Jun-2017 15:30:00 View
528 Through renovation of Crewâs block and water proofing treatment...31-May-2017   31-May-2017 11:40:00 28-Jun-2017 15:30:00 View
529 Providing & supplying different category of labourers with necessary tools & tackles...31-May-2017   31-May-2017 16:35:00 09-Jun-2017 15:30:00 View
530 Supply of unskilled labour at any location...26-May-2017   26-May-2017 13:20:00 06-Jun-2017 15:30:00 View
531 Operation of fresh water Centrifugal pump...23-May-2017   23-May-2017 15:00:00 05-Jun-2017 15:30:00 View
532 Development of different undeveloped areas for Container Stacking at the eastern side of 4 NSD Gate...23-May-2017   23-May-2017 16:30:00 15-Jun-2017 15:30:00 View
533 Construction of 2 nos.new Toilet Block and other ancilary work...23-May-2017
» Corrigendum -I
23-May-2017 16:20:00 15-Jun-2017 15:30:00 View
534 Upkeepment and maintenance of office of the Superintending Engineer (KPD)...19-May-2017   19-May-2017 11:10:00 30-May-2017 15:30:00 View
535 Providing services for Upkeepment of different site office of the Superintending Engineer, K.P. Dock...19-May-2017   19-May-2017 12:30:00 30-May-2017 15:30:00 View
536 Operation of pump motor set at A shed reservoir including valve operation...19-May-2017   19-May-2017 12:45:00 30-May-2017 15:30:00 View
537 Repairs to damaged portion of the boundary wall to avoid security breaches on the land...18-May-2017   18-May-2017 16:20:00 19-Jun-2017 15:30:00 View
538 Cleaning drains under South Division and other ancillary works...15-May-2017
» Corrigendum
15-May-2017 09:50:00 05-Jun-2017 15:30:00 View
539 Measures for Security arrangement and thorough renovation of the Generator room...12-May-2017   12-May-2017 16:10:00 06-Jun-2017 15:30:00 View
540 Thorough repairing and renovation of office...12-May-2017   12-May-2017 16:20:00 06-Jun-2017 15:30:00 View
541 Providing assistance for upkeepment of office premises...12-May-2017
» Corrigendum
12-May-2017 16:35:00 25-May-2017 15:30:00 View
542 Supply of daily labour at various sites of River Training Wing...11-May-2017   11-May-2017 15:15:00 23-May-2017 15:00:00 View
543 Supplying of daily labourers for miscellaneous non-measurable works...10-May-2017   10-May-2017 13:15:00 23-May-2017 15:15:00 View
544 General Maintenance, Up keeping of Camp premises, sheds/Buildings, offices etc...10-May-2017   10-May-2017 14:50:00 06-Jun-2017 15:30:00 View
545 Thorough repairs to Shed no. 9 & L.G. Shed at Dk-I (East)...10-May-2017
» Corrigendum -I
10-May-2017 17:00:00 08-Jun-2017 15:30:00 View
546 Patch repair to the carriage ways of different roads...09-May-2017   09-May-2017 17:00:00 07-Jun-2017 15:30:00 View
547 Repairing and replacement of damaged fenders...09-May-2017   09-May-2017 17:15:00 07-Jun-2017 15:30:00 View
548 Up keeping and regular maintenance of Civil Engineering accommodation...08-May-2017   08-May-2017 16:00:00 19-May-2017 15:30:00 View
549 Facelifting of entrances , widening of Southside gate.....05-May-2017   05-May-2017 15:20:00 19-May-2017 15:00:00 View
550 Petty miscellaneous building repair works including plumbing and sanitary...05-May-2017   05-May-2017 15:50:00 05-Jun-2017 15:30:00 View
551 Emergent petty repairs to different roads under South Division....05-May-2017   05-May-2017 15:55:00 05-Jun-2017 15:30:00 View
552 Cleaning of silt including removing of leftover materials, garbage mixed with rubbish...03-May-2017   03-May-2017 12:30:00 26-May-2017 15:30:00 View
553 Cleaning and disinfecting different types & size of drinking water tanks inside & outside dock under NSD section...02-May-2017   02-May-2017 15:10:00 19-May-2017 15:00:00 View
554 Petty plumbing and sanitary works of Kolkata Jetty area...28-April-2017   28-Apr-2017 13:25:00 11-May-2017 15:30:00 View
555 Repairs to the boundary wall for Copper Smith Shop...27-April-2017
» Corrigendum
27-Apr-2017 17:00:00 12-May-2017 15:00:00 View
556 General maintenance upkeepment of the Office Premises, Corridors, Toilets...26-April-2017   26-Apr-2017 14:30:00 09-May-2017 15:00:00 View
557 Development of Customs Inspection facility area-II....24-Apr-2017
» Corrigendum - I
24-Apr-2017 09:50:00 16-May-2017 15:30:00 View
558 Repairing & painting old partially damaged boundary wall...24-April-2017   24-Apr-2017 15:10:00 16-May-2017 15:30:00 View
559 Cleaning of Drains along both side of HIDE ROAD...24-April-2017   24-Apr-2017 15:15:00 16-May-2017 15:30:00 View
560 Renovation and reconstruction of damaged Electrical Switch room...21-April-2017   21-Apr-2017 13:30:00 05-May-2017 15:30:00